My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 033900 Concrete Curing-6 <br /> <br />G. Hot Weather Concreting and Curing: Placing and protection of concrete shall <br />be in conformance with ACI 305.1 and shall meet approval of Engineer prior to <br />its use. <br /> <br />1. Contractor shall conform to ACI 305.1 when following conditions exist: <br /> <br />a. Any combination of high air temperature, low relative <br />humidity and high wind velocity. <br />b. Any combination of rising air temperature and falling relative <br />humidity. <br /> <br />2. Under hot weather conditions, Contractor shall be responsible for <br />making arrangements for installation of windbreaks, shading, fog <br />spraying, sprinkling, ponding or wet covering of light color. <br />Arrangements shall be made in advance of placement and such <br />protective measures shall be taken as quickly as concrete hardening and <br />finishing operations will allow. <br /> <br />3.3 PROTECTION OF FINISHED WORK <br /> <br />A. Protect finished work under provisions Division 1 - General Requirements. <br /> <br />B. Do not permit traffic over unprotected floor surface. <br /> <br />3.4 FINAL ACCEPTANCE OF COMPLETE WORK <br /> <br />A. The work shall be complete in every detail and the finished work approved by <br />the Architect/ Engineer and Owner before final acceptance. <br /> <br /> <br />END OF SECTION <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.