My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 051200 Structural Steel Framing-3 <br /> <br /> <br /> <br />6. Identify members and connections of the Seismic-Load-Resisting System. <br /> <br />7. Indicate locations and dimensions of protected zones. <br /> <br />8. Identify demand critical welds. <br /> <br />D. Welding Procedure Specifications (WPSs) and Procedure Qualification Records (PQRs): <br />Provide according to AWS D1.1/D1.1M, "Structural Welding Code - Steel," for each welded <br />joint [whether prequalified or qualified by testing] [qualified by testing], including the <br />following: <br /> <br />1. Power source (constant current or constant voltage). <br /> <br />2. Electrode manufacturer and trade name, for demand critical welds. <br /> <br />E. Delegated-Design Submittal: For structural-steel connections indicated to comply with <br />design loads, include analysis data [ signed and sealed by the qualified professional <br />engineer responsible for their preparation]. <br /> <br />1.7 INFORMATIONAL SUBMITTALS <br /> <br />A. Qualification Data: For [Installer] [fabricator] [shop-painting applicators] [professional <br />engineer] [testing agency]. <br /> <br />B. Welding certificates. <br /> <br />C. Paint Compatibility Certificates: From manufacturers of topcoats applied over shop primers, <br />certifying that shop primers are compatible with topcoats. <br /> <br />D. Mill test reports for structural steel, including chemical and physical properties. <br /> <br />E. Product Test Reports: For the following: <br /> <br />1. Bolts, nuts, and washers including mechanical properties and chemical analysis. <br /> <br />2. Direct-tension indicators. <br /> <br />3. Tension-control, high-strength, bolt-nut-washer assemblies. <br /> <br />4. Shear stud connectors. <br /> <br />5. Shop primers. <br /> <br />6. Non-Shrink grout. <br /> <br />F. Survey of existing conditions. <br /> <br />G. Source quality-control reports. <br /> <br />H. Field quality-control [ and special inspection] reports.
The URL can be used to link to this page
Your browser does not support the video tag.