Laserfiche WebLink
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 051200 Structural Steel Framing-15 <br /> <br /> <br /> <br />B. Touchup Painting: Immediately after erection, clean exposed areas where primer is <br />damaged or missing and paint with the same material as used for shop painting to comply <br />with SSPC-PA 1 for touching up shop-painted surfaces. <br /> <br />1. Clean and prepare surfaces by SSPC-SP 2 hand-tool cleaning or SSPC-SP 3 power- <br />tool cleaning. <br /> <br /> <br />C. Touchup Painting: Cleaning and touchup painting are specified in Section 099113 "Exterior <br />Painting" and Section 099123 "Interior Painting." <br /> <br />D. Touchup Priming: Cleaning and touchup priming are specified in Section 099600 "High- <br />Performance Coatings." <br />END OF SECTION <br />