Laserfiche WebLink
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 053000-6 <br /> <br />E. Cutting and Fitting: Cut and neatly fit deck units and accessories around other work <br />projecting through or adjacent to the decking. <br /> <br />F. Reinforcement at openings: Provide additional metal reinforcement and closures pieces as <br />required for strength, continuity of decking and support of other work shown. <br /> <br />1. Deck penetrations affecting no more than (1) deck rib need not be reinforced. <br /> <br />2. For deck penetration affecting more than (1) deck rib, but less than 10", reinforce <br />the opening with a 0.057" thick plate spanning between unaffected ribs, unless <br />otherwise shown on the Design Drawings or supporting a piece of mechanical <br />equipment (see item 3). <br /> <br />3. Reinforce deck penetrations larger than 10" with the structural frame described in <br />the Design Drawings. <br /> <br />G. Joint Covers: Provide metal joint covers at abutting ends and changes in direction of floor <br />deck units. <br /> <br />H. Roof Sump Pans: Place over openings provided in roof decking and weld to top decking <br />surface. Space welds not more than 12" on center with at least 1 weld in each corner. Cut <br />opening in roof sump bottom to accommodate drain size indicated. <br /> <br />I. Closure Strips: Provide metal closure strips at open uncovered ends and edges of roof <br />decking, and in voids between decking and other construction. Weld into position to provide <br />a complete decking installation. <br /> <br />J. Touch-Up Painting: <br /> <br />1. Painted Deck: After decking installation, wire brush, clean and paint scarred areas, <br />welds and rust spots on top and bottom surfaces of decking units and supporting <br />steel members. <br /> <br />a. Touch up painted surfaces with same type paint used on adjacent surfaces. <br />b. In areas where shop-painted surfaces are to be exposed, apply touch-up <br />paint to blend into adjacent surfaces. <br /> <br />3.3 QUALITY CONTROL <br /> <br />A. General: Contractor is responsible for maintaining quality control in the field and for <br />providing a structure that is in strict compliance with the Contract Documents. <br /> <br />B. Required inspection and testing services are intended to assist the Contractor in complying <br />with the Contract Documents. These specified services, however, do not relieve the <br />Contractor of his responsibility for compliance, nor are they intended to limit the <br />Contractor’s quality control efforts in the field. <br /> <br />C. Testing: Owner shall engage an Independent Testing Agency to inspect all puddle welded <br />connections, to perform tests and prepare reports of their findings. All connections must <br />pass these inspections prior to the installation of subsequent work which they support.