My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 053000-6 <br /> <br />E. Cutting and Fitting: Cut and neatly fit deck units and accessories around other work <br />projecting through or adjacent to the decking. <br /> <br />F. Reinforcement at openings: Provide additional metal reinforcement and closures pieces as <br />required for strength, continuity of decking and support of other work shown. <br /> <br />1. Deck penetrations affecting no more than (1) deck rib need not be reinforced. <br /> <br />2. For deck penetration affecting more than (1) deck rib, but less than 10", reinforce <br />the opening with a 0.057" thick plate spanning between unaffected ribs, unless <br />otherwise shown on the Design Drawings or supporting a piece of mechanical <br />equipment (see item 3). <br /> <br />3. Reinforce deck penetrations larger than 10" with the structural frame described in <br />the Design Drawings. <br /> <br />G. Joint Covers: Provide metal joint covers at abutting ends and changes in direction of floor <br />deck units. <br /> <br />H. Roof Sump Pans: Place over openings provided in roof decking and weld to top decking <br />surface. Space welds not more than 12" on center with at least 1 weld in each corner. Cut <br />opening in roof sump bottom to accommodate drain size indicated. <br /> <br />I. Closure Strips: Provide metal closure strips at open uncovered ends and edges of roof <br />decking, and in voids between decking and other construction. Weld into position to provide <br />a complete decking installation. <br /> <br />J. Touch-Up Painting: <br /> <br />1. Painted Deck: After decking installation, wire brush, clean and paint scarred areas, <br />welds and rust spots on top and bottom surfaces of decking units and supporting <br />steel members. <br /> <br />a. Touch up painted surfaces with same type paint used on adjacent surfaces. <br />b. In areas where shop-painted surfaces are to be exposed, apply touch-up <br />paint to blend into adjacent surfaces. <br /> <br />3.3 QUALITY CONTROL <br /> <br />A. General: Contractor is responsible for maintaining quality control in the field and for <br />providing a structure that is in strict compliance with the Contract Documents. <br /> <br />B. Required inspection and testing services are intended to assist the Contractor in complying <br />with the Contract Documents. These specified services, however, do not relieve the <br />Contractor of his responsibility for compliance, nor are they intended to limit the <br />Contractor’s quality control efforts in the field. <br /> <br />C. Testing: Owner shall engage an Independent Testing Agency to inspect all puddle welded <br />connections, to perform tests and prepare reports of their findings. All connections must <br />pass these inspections prior to the installation of subsequent work which they support.
The URL can be used to link to this page
Your browser does not support the video tag.