My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 055000 Miscellaneous Metals-3 <br /> <br /> <br /> <br />B. Coordinate installation of metal fabrications that are anchored to or that receive other <br />work. Furnish setting drawings, templates, and directions for installing anchorages, <br />including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are <br />to be embedded in concrete or masonry. Deliver such items to Project site in time for <br />installation. <br /> <br />1.4 ACTION SUBMITTALS <br /> <br />A. Product Data: For the following: <br /> <br />1. Nonslip aggregates and nonslip-aggregate surface finishes. <br /> <br />2. Prefabricated building columns. <br /> <br />3. Metal no sings and treads. <br /> <br />4. Paint products. <br /> <br />5. Grout. <br /> <br />B. Sustainable Design Submittals: <br /> <br />1. <Double click to insert sustainable design text for recycled content.> <br /> <br />C. Shop Drawings: Show fabrication and installation details. [ Include plans, elevations, <br />sections, and details of metal fabrications and their connections. Show anchorage and <br />accessory items.] Provide Shop Drawings for the following: <br /> <br />1. Steel framing and supports for ceiling-hung toilet compartments. <br /> <br />2. Steel framing and supports for operable partitions. <br /> <br />3. Steel framing and supports for overhead [doors] [and] [grilles]. <br /> <br />4. Steel framing and supports for countertops. <br /> <br />5. Steel tube reinforcement for low partitions. <br /> <br />6. Steel framing and supports for mechanical and electrical equipment. <br /> <br />7. Steel framing and supports for applications where framing and supports are not <br />specified in other Sections. <br /> <br />8. Elevator machine beams [, hoist beams,] [and] [divider beams]. <br /> <br />9. Steel shapes for supporting elevator door sills. <br /> <br />10. Steel girders for supporting wood frame construction. <br /> <br />11. Steel pipe columns for supporting wood frame construction. <br /> <br />12. Prefabricated building columns.
The URL can be used to link to this page
Your browser does not support the video tag.