My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 072600 Vapor Retarder-1 <br />SECTION 072600 <br />VAPOR RETARDERS <br /> <br />PART 1 - GENERAL <br /> <br />1.1 REFERENCES <br /> <br />A. ASTM International: <br /> <br />1. ASTM D146 Standard Test Methods for Sampling and Testing Bitumen-Saturated <br />Felts and Woven Fabrics for Roofing and Waterproofing. <br /> <br />2. ASTM D412 Standard Test Methods for Vulcanized Rubber and Thermoplastic <br />Elastomers-Tension. <br /> <br />3. ASTM E96 Standard Test Methods for Water Vapor Transmission of Materials. <br /> <br />4. ASTM E154 Standard Test Methods for Water Vapor Retarders Used in Contact <br />with Earth Under Concrete Slabs, on Walls, or as Ground Cover. <br /> <br />5. ASTM E283 Standard Test Method for Determining Rate of Air Leakage Through <br />Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences <br />Across the Specimen. <br /> <br />1.2 SUBMITTALS <br /> <br />A. General: Submit listed submittals in accordance with Conditions of the Contract and <br />Division 01 Submittal Procedures Section. <br /> <br />B. Product Data: Submit product data, including manufacturer's SPEC-DATA sheet, for <br />specified products. <br /> <br />C. Samples: Submit 6-inch x 6-inch (152 x 152 mm) samples of specified membrane(s). <br /> <br />1.3 DELIVERY, STORAGE & HANDLING <br /> <br />A. General: Comply with Division 01 Product Requirements Section. <br /> <br />B. Delivery: Deliver materials in manufacturer's original, unopened, undamaged containers <br />with identification labels intact. <br /> <br />C. Storage and Protection: Store materials protected from exposure to harmful environmental <br />conditions and at temperature and humidity conditions recommended by the <br />manufacturer. <br /> <br />1.4 WARRANTY <br /> <br />A. Project Warranty: Refer to Conditions of the Contract for project warranty provisions. <br /> <br />B. Manufacturer's Warranty: Submit, for Owner's acceptance, manufacturer's standard <br />warranty document executed by authorized company official. Manufacturer's warranty is
The URL can be used to link to this page
Your browser does not support the video tag.