My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 072700 Thermal and Air Barrier Wall <br />System-2 <br />a) ASTM C518, 140degreeF/90day Aged R-Value (measured at <br />75degree F Mean Temp.); for product with a minimum 60-degree <br />F ambient and substrate application temperature is R6.1/inch. <br />b) Core density: ASTM D1622, Minimum 2.0 pcf. <br /> <br />2. Air barrier performance: When tested in accordance with ASTM E2357, at a test <br />pressure of not less than 6.24 psf, air infiltration shall not exceed 0.04 cfm per <br />square foot of fixed wall area. <br /> <br />3. Testing should be conducted at positive and negative sustained wind loading of <br />12.5psf for one-hour duration in each direction, pressure cycling of the wall at <br />2000 cycles in both the positive and negative direction, ending with wind gust <br />loading at 25psf. <br /> <br />4. Water penetration: When tested in accordance with ASTM E331, no uncontrolled <br />water penetration shall occur at a minimum differential pressure of 6.24 psf for <br />minimum test duration of 2hrs. <br /> <br />5. Mold resistance: Thermal wall and air barrier system components shall provide <br />non-food source for fungal growth. <br /> <br />C. Code Compliance: Exterior wall system and component materials shall comply with the <br />following requirements: <br /> <br />1. Exterior Insulation: <br /> <br />a. Class 1 (<and/or= 25 Flame Spread Index and < 450 Smoke Developed <br />Index) classified at Max. thickness per UL 723 criteria or ASTM E84 <br />criteria. <br />b. Fire Performance Evaluation as a component of an NFPA 285 approved <br />wall assembly per the requirements of the Pennsylvania Uniform <br />Construction Code. <br /> <br />2. Spray Polyurethane Foam: <br /> <br />a. Class 1 (<and/or= 25 Flame Spread Index and < 450 Smoke Developed <br />Index) classified at Max. thickness per UL 723 criteria or ASTM E84 <br />criteria. <br />b. Fire Performance Evaluation as a component of an NFPA 285 approved <br />wall assembly per the requirements of the Pennsylvania Uniform <br />Construction Code <br /> <br />3. System complies with ASTM E2357: Test Method for determining Air <br />Leakage of Air Barrier Assemblies. <br /> <br />4. System complies with NFPA 285: Standard method of Testing for the Evaluation <br />of Flammability Characteristics of Exterior Non-Load Bearing Wall Assemblies <br />containing Combustible components using the Intermediate Scale, Multi-Story <br />Test Apparatus. <br /> <br />D. Fire Resistance: <br /> <br />1. System complies with NFPA 285: Standard Method of Test for the Evaluation
The URL can be used to link to this page
Your browser does not support the video tag.