Laserfiche WebLink
<br /> <br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 074633-4 <br />approved by Architect. <br /> <br />D. Pre-Installation Meetings: Conduct pre-installation conference to verify project <br />requirements, substrate conditions, manufacturer's installation instructions and <br />manufacturer's warranty requirements. <br /> <br />1.6 DELIVERY, STORAGE, AND HANDLING <br /> <br />A. Delivery: <br /> <br />1. During transportation, use stable, flat pallets that are at least the same <br />dimension as the sheets. <br /> <br />2. Materials shall be packaged to minimize or eliminate the possibility of <br />damage during shipping. Items such as wooden side boards, wooden lid, <br />and spacers or protective sheeting between panels shall be used to protect <br />the panels from surface and/or edge damage. <br /> <br />B. Storage: <br /> <br />1. Store products in an enclosed area protected from direct sunlight, <br />moisture and heat. Maintain a consistent temperature and humidity. <br /> <br />2. Store products in manufacturer's and/or fabricators unopened packaging until <br />ready for installation. <br /> <br />3. Stack planks using protective dividers to avoid damage to decorative surface. <br /> <br />4. For horizontal storage, store planks on pallets of equal or greater size as <br />the planks with a protective layer between the pallet and planks and on <br />top of the uppermost sheet. <br /> <br />5. Do not store planks vertically. <br /> <br />C. Handling: <br /> <br />1. Remove protective film within 24 hours of the panels being removed from the <br />pallet. <br /> <br />2. When moving planks, lift evenly to avoid dragging planks across each <br />other and scratching the decorative surface. <br /> <br />3. Remove all labels and stickers immediately after installation. <br /> <br />1.7 PROJECT CONDITIONS <br /> <br />A. Maintain environmental conditions (temperature, humidity, and ventilation) within <br />limits recommended by manufacturer for optimum results. Do not install products <br />under environmental conditions outside manufacturer's absolute limits. <br /> <br />B. Field Measurements: Verify actual measurements/openings by field measurements <br />performed by the installer prior to release for fabrication. Recorded measurements