My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br />Project No. 21-1011 November 2024 076200 Flashing and Sheet Metal-10 <br />all directions, set in a bed of asphalt mastic. <br /> <br />D. Install pre-manufactured scupper. <br /> <br />E. Install scupper head below outside of port and new downspouts. <br />F. Prime metal surfaces to receive membrane plies and allow to dry. <br /> <br />G. Solidly adhere roof membrane plies completely to stripping plies, scupper flanges, cant, <br />and port, progressing plies 1-2” further than previous applied ply. <br />H. Wall flashings shall extend over flanges and roof membrane out 6” past cant. <br /> <br />3.8 AT GRAVEL STOP, DRIP EDGE, AND FASCIA <br /> <br />A. Remove existing edge flashing system to wood blocking. <br /> <br />B. Replace rotted blocking as needed and approved by building Owner's representative. <br /> <br />C. Provide tapered edge strip along gravel stop, over installed insulation at blocking edge. <br />Firmly butt tapered edge strip to blocking. Fully adhere edge strip to insulation. <br /> <br />D. Solidly adhere roof membrane plies completely to insulation and blocking. Envelope felts. <br />Ensure complete bond and continuity without wrinkles or voids. <br /> <br />E. Install fascia system and stripping plies according to detail drawings. <br /> <br />F. Install new downspouts at spill-out scupper locations. Dimensions to match existing. <br />3.9 AT EDGE/GUTTERS <br /> <br />A. Remove existing edge flashing, gutters and downspouts. <br /> <br />B. Replace rotted blocking as needed and approved by building Owner’s representative. <br />Install insulation firmly butting against wood blocking. <br /> <br />C. Solidly adhere roofing membrane plies completely to insulation blocking. Ensure complete <br />bond and continuity without wrinkles or voids. <br /> <br />D. Fabricate and install new edge/gutter with outlet tubes. Locate outlet tubes in original <br />position. Slope gutter to outlets. <br /> <br />E. Install gutter support system. <br /> <br />F. Provide gutter expansion joints every 30 feet. <br /> <br />G. Fasten and strip-in gutter flange according to detail drawing. <br /> <br />H. Install new downspouts. Dimensions to match existing. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.