My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 077200 Roof Accessories-5 <br /> <br />C. Roof Curb Installation: Install each roof curb so top surface is level. <br /> <br />D. Equipment Support Installation: Install equipment supports so top surfaces are level with <br />each other. <br /> <br /> <br />E. Roof-Hatch Installation: <br /> <br />1. Install roof hatch so top surface of hatch curb is level. <br /> <br />2. Verify that roof hatch operates properly. Clean, lubricate, and adjust <br />operating mechanism and hardware. <br /> <br />3. Attach safety railing system to roof-hatch curb. <br /> <br />4. Attach ladder-assist post according to manufacturer's written instructions. <br /> <br />F. Heat and Smoke Vent Installation: <br /> <br />1. Install heat and smoke vent so top perimeter surfaces are level. <br /> <br />2. Install and test heat and smoke vents and their components for proper operation <br />according to NFPA 204. <br /> <br />G. Gravity Ventilator Installation: Verify that gravity ventilators operate properly and have <br />unrestricted airflow. Clean, lubricate, and adjust operating mechanisms. <br /> <br />H. Pipe Support Installation: Install pipe supports so top surfaces are in contact with and <br />provide equally distributed support along length of supported item. <br /> <br />I. Security Grilles: Weld bar intersections and, using tamper-resistant bolts, attach the ends <br />of bars to structural frame or primary curb walls. <br /> <br />J. Roof Walkway Installation: <br /> <br />1. Verify that locations of access and servicing points for roof-mounted equipment <br />are served by locations of roof walkways. <br /> <br />2. Remove ballast from top surface of low-slope roofing at locations of contact with <br />roof- walkway supports. <br /> <br />3. Install roof walkway support pads prior to placement of roof walkway support <br />stands onto low-slope roofing. <br /> <br />4. Redistribute removed ballast after installation of support pads. <br /> <br />K. Preformed Flashing-Sleeve Installation: Secure flashing sleeve to roof membrane <br />according to flashing-sleeve manufacturer's written instructions. <br /> <br />L. Seal joints with elastomeric or butyl sealant as required by roof accessory manufacturer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.