My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 078400-8 <br /> <br />c. Tremco: MCR. <br /> <br />3. Prefabricated Firestop Collar: <br /> <br />a. AD Firebarrier Collars. <br />b. Bio Fireshield: Biostop Pipe Collar. <br />c. Hilti: CP 642. <br />d. STI: Spec Seal plastic pipe collars. <br />e. 3M: PPD. <br />f. Tremco: Tremstop D Firestop Collars. <br /> <br />4. Fire Prevention Pillows: Meeting ASTM E814 requirements and classified by UL. <br /> <br />a. Bio Fireshield: Bio Firestop Pillows. <br />b. Hilti: FS 657 Fire Block. <br />c. STI: Spec Seal. <br />d. Tremco: Tremstop. <br /> <br />5. Fire and Smoke Barrier Spray. <br /> <br />a. Bio Fireshield: Biostop 700, Biostop 750. <br />b. 3M: Fire Dam Spray. <br />c. Accepted equivalent. <br /> <br />6. Hose Clamps for Restricting Collars: Standard galvanized steel or stainless-steel <br />hose clamps. <br /> <br />7. Fire Barrier Partitions and Covers: 3M type PSS-7904 R device complete with front <br />and back covers of 3M composite sheet CS-195 or accepted equivalent, all <br />necessary related galvanized steel supports, cover plates and fastenings. <br /> <br />8. Metal Supports for Firesafing "Packing Material": <br /> <br />a. 30 gages by 1-inch-wide galvanized sheet steel "Z" shaped clips to <br />support "packing material" around floor penetrations. <br />b. 10 gage galvanized steel wire hat shaped support hangers to support <br />"damming material" or "packing material" at floor penetrations. <br />c. Hardware cloth of 19 gage galvanized 1/2" mesh wire. <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 EXAMINATION <br /> <br />A. Examine substrates and conditions, with Installer present, for compliance with requirements <br />for opening configurations, penetrating items, substrates, and other conditions affecting <br />performance of firestopping. Do not proceed with installation until unsatisfactory conditions <br />have been corrected. <br /> <br />3.2 PREPARATION <br /> <br />A. Surface Cleaning: Clean out openings and joints immediately prior to installing firestopping to <br />comply with recommendations of firestopping manufacturer and the following requirements: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.