Laserfiche WebLink
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br /> <br />Project No. 21-1011 November 2024 079200-2 <br /> <br /> <br />c. ASTM C882 - Standard Test Method for Bond Strength of Epoxy-Resin <br />Systems Used with Concrete by Slant Shear. <br />d. ASTM C919 - Standard Practice for Use of Sealants in Acoustical <br />Applications. <br />e. ASTM C920 - Standard Specification for Elastomeric Joint Sealants. <br />f. ASTM C1330 - Standard Specification for Cylindrical Sealant Backing for <br />Use with Cold Liquid Applied Sealants. <br /> <br />4. Federal Specification (FS): <br /> <br />a. FS TT-S-00227E (COM-NBS) – Interim Federal Specification for Sealing <br />Compound: Elastomeric Type, Multi-Component for Caulking, Sealing, and <br />Glazing in Buildings and Other Structures. <br />b. FS TT-S-00230C – Interim Federal Specification for Sealing Compound: <br />Elastomeric Type, Single Component for Caulking, Sealing, and Glazing in <br />Buildings and Other Structures. <br />c. FS TT-S-001543 (COM-NBS) – Interim Federal Specification for Sealing <br />Compound: Silicone Rubber Base for Caulking, Sealing, and Glazing in <br />Buildings and Other Structures. <br /> <br />1.5 SUBMITTALS <br /> <br />A. Manufacturers published literature with names, catalog numbers, specifications, surface <br />preparation, mixing and application directions and standard color charts. Laboratory tests or <br />data validating product compliance with performance criteria specified. <br /> <br />B. Warranties covering the sealant materials for a twenty (20) year period from date of project <br />acceptance covering joint failure and contractor’s five (5) year workmanship warranty. <br /> <br />1. Joint failure is defined as leaks of air or water, evidence of loss of cohesion or <br />adhesion between sealant and joint edge, fading or migration of sealant material. <br /> <br />C. Samples: <br /> <br />1. Manufacturer's Standard Color Charts: Full color range for selection by Architect. <br /> <br />2. Joint Fillers and Bond Breaker Tape: Small samples of each type for review. <br /> <br />1.6 QUALITY ASSURANCE <br /> <br />A. Applicator Qualifications: Contractor and job foreman must have a minimum of ten (10) <br />years’ experience installing sealant. <br /> <br />B. Compatibility and Adhesion Test: Contractor shall be responsible for verifying with sealant <br />manufacturer that all sealants to be used are compatible with and will satisfactorily adhere to <br />all substrates including other shop applied system sealants which may come in contact with <br />field applied sealants. Tests may be conducted in the field or by submission of <br />representative substrate samples to sealant manufacturer’s laboratory. <br /> <br />C. Mock-Up: If requested by the Owner/Architect/Consultant, Contractor shall install sealant <br />mock-up to demonstrate appearance and workmanship technique. Mock-up shall be done <br />by those personnel who will be assigned to the project.