My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br /> <br />Project No. 21-1011 November 2024 079200-11 <br /> <br /> <br />D. Interior High-Movement Joints: <br /> <br />1. Sealant: <br /> <br />a. Single component polyurethane. <br />b. Two component polyurethane. <br />c. Polysulfide. <br />d. Silicone. <br />e. At resilient joint between interior partitions and floor framing above. <br /> <br /> <br />E. Other Interior Applications: <br /> <br />1. Sealant: <br /> <br />a. Single component polyurethane. <br />b. Two component polyurethane. <br />c. Polysulfide. <br />d. Silicone. <br /> <br />2. Applications: <br /> <br />a. Between adjacent construction and equipment, shelving, casework, and <br />furniture. <br />b. Perimeters of doors and window frames, access panels. <br />c. Between interior partitions and adjoining concrete or steel columns, walls, <br />or other construction. <br />d. Other exposed locations within partitions to seal against passage of air. <br />e. Other interior joints of small dimension which require painting. <br />f. Gypsum board partitions: <br /> <br />a) Between gypsum panels and metal track at floors and dissimilar <br />walls; install sealant just prior to installation of gypsum panel. <br />b) Between adjacent face layers of abutting intersection gypsum board <br />partitions; install sealant before taping and finishing joint. <br />c) Between gypsum panels and intersections. Seal around openings <br />of ducts and pipes. Seal sides and backs of electrical boxes. <br />d) Seal control joints prior to installing control joint trim. <br />e) Other concealed locations within partitions to completely seal <br />against passage of air. <br /> <br />3. Allow sealant to cure before painting over joint. <br /> <br />F. Exterior Traffic Surfaces: <br /> <br />1. Sealant: <br /> <br />a. Two component self-leveling polyurethane. <br />b. Single component self-leveling polyurethane. <br /> <br />2. Applications: <br />
The URL can be used to link to this page
Your browser does not support the video tag.