My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21.1011 November 2024 015000 Temporary Facilities and Controls-1 <br />SECTION 015000 <br />TEMPORARY FACILITIES AND CONTROLS <br /> <br />PART 1 - GENERAL <br /> <br />1.1 DESCRIPTION: This Section specifies furnishing, installing, operating, maintaining and removing <br />temporary facilities required for the prosecution of the work. <br /> <br />1.2 QUALITY ASSURANCE: <br /> <br />A. Temporary electrical power and lighting shall be provided in accordance with the <br />applicable requirements of OSHA, Part 1926, Safety and Health Regulations for <br />Construction and installed in accordance with the NEC and all other applicable local and <br />National Codes. <br /> <br />B. Temporary Sanitary Facilities, first aid services and fire protection shall be provided in <br />accordance with the applicable requirements of OSHA, Part 1926, Safety and Health <br />Regulations for Construction. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 ELECTRICAL MATERIALS: As required, UL listed. <br /> <br />2.2 SANITARY FACILITIES: As required. <br /> <br />2.3 FIRST AID SERVICES: <br /> <br />A. Supplies: Not less than one 16-unit first aid kit for each 50 persons, or fraction thereof, <br />employed at the Work site. <br /> <br />B. Personnel: Not less than one certified person for each 50 persons, or fraction thereof, <br />employed at the Work site. Provide each member of the first aid staff with a hard hat <br />with the first aid emblem affixed to the rear of the hat. First aid personnel may be <br />assigned other duties not interfering with their duties as first aid personnel. <br /> <br />2.4 FIRE PROTECTION MATERIALS: As required. <br /> <br />2.5 PROJECT SIGN <br /> <br />A. Project signs to be supplied by MDC. The signs are to be picked-up by the contractor at <br />a location designated by the Representative. <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 ELECTRICAL POWER AND LIGHTING: <br /> <br />A. Locate and arrange electrical components so that they will not interfere with operations. <br />Adequately support and protect from damage. <br /> <br />B. Maintain system in an operable condition. Promptly replace burned-out lamps, damaged <br />conduits, defective wiring and other nonoperating or defective components. <br />
The URL can be used to link to this page
Your browser does not support the video tag.