My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 087100 <br />Door Hardware-7 <br /> <br />3. Install each item of hardware in compliance with the manufacturer’s instructions <br />and recommendations. Whenever cutting and fitting is required to install hardware <br />onto or into surfaces which require further painting and/or finishing, coordinate <br />removal, storage and reinstallation or application of surface protection with <br />finishing work in Division 09, Section: Painting. <br /> <br /> <br />4. Set units level, plumb and true to line and location. Adjust and reinforce the <br />substrate as necessary for proper installation and operation. <br /> <br />5. Drill and countersink units which are not factory prepared for anchors and <br />anchorage fasteners. <br /> <br />3.3 FIELD QUALITY CONTROL <br /> <br />A. INSPECTION: <br /> <br />1. Provide the services of an Architectural Hardware Consultant, following the <br />completion of installation, to verify the hardware is in accordance with the <br />approved hardware and keying schedules and check operation and adjustment of <br />all hardware items. <br /> <br />3.4 ADJUSTING AND CLEANING: <br /> <br />A. Adjust and check each operating item of hardware and each door, to ensure proper <br />operation and function. Replace units which cannot be adjusted to operate as intended for <br />the application. <br /> <br />B. Final adjustments are to be made during the week prior to the Owners acceptance or <br />occupancy. Check operation of all hardware and adjust door control devices to compensate <br />for final adjustments to the heating and ventilating system. <br /> <br />C. Instruct Owners personnel in the proper adjustment and maintenance of hardware and <br />finishes. <br /> <br />D. Furnish the owners personnel with all special tools required to adjust and maintain the <br />Hardware. <br /> <br />E. Approximately six (6) months after acceptance of the hardware in each area, the installer, <br />accompanied by representatives of the various manufacturers, shall return to the project <br />to check and readjust every item of hardware to restore proper function. Consult with and <br />instruct the Owners personnel in recommended additions to the maintenance procedures. <br />Replace hardware items which have deteriorated or failed due to faulty design or materials. <br />Prepare a written report of current predictable problems (of a substantial nature) in the <br />performance of the hardware. <br /> <br />3.5 PROTECTION <br /> <br />A. The contractor is responsible, after acceptance of the finish hardware, for the proper <br />protection of all items of finish hardware until the owner accepts the project as complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.