Laserfiche WebLink
<br /> <br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 January 2019 016400 SUBSTITUTIONS AND PRODUCT <br />OPTIONS-2 <br />and test data and pertinent reference standards. <br /> <br />3. For construction methods: <br /> <br />c. Detailed description of proposed method. <br />d. Working drawings illustrating methods. <br /> <br />3. Itemized comparison of proposed substitution with product specified. Comparison <br />shall include cost, differences in estimated life, estimated maintenance, <br />availability of spare parts and repair services, energy consumption, performance <br />capacity, salvageability, manufacturer's warranties and other material <br />differences. <br /> <br />4. Data relating to changes in construction schedule. <br /> <br />5. Accurate cost data on proposed substitution in comparison with product and <br />method specified except that cost data will not be required on substitutes <br />proposed as equal, equivalent or superior to specified brand names and for which <br />no request is made for price adjustment to the Subcontract. <br /> <br />6. Equitable adjustment and credit that the Contractor proposes to offer MDC if the <br />substitutions are not equal, equivalent or superior to specified brand names. <br /> <br />B. In making request for substitution, Contractor shall verify: <br /> <br />1. That he has personally investigated the proposed product and method and that to <br />the best of his knowledge, information and belief, the product and method is either <br />equivalent or superior to that product and method specified and that he will update <br />information as new or different data become known to him. <br /> <br />2. That he will furnish the same guarantee for substitution as he would for the product <br />and method specified. <br /> <br />3. That he will coordinate installation of the accepted substitution into the Work and <br />will make those changes required for the Work to be complete and operable. <br /> <br />4. That cost data is complete and includes related costs and excludes cost of <br />engineering redesign. <br /> <br />5. That he waives claims for additional time and costs related to the substitution, <br />which becomes apparent. <br /> <br />C. Amend and update list as changes concerning information on the list become known to him. <br /> <br />D. Substitutions will not be considered, if indicated or implied on Shop Drawings or Product <br />Data submittal for which no formal request for substitution has been submitted. Requests <br />for substitutions will not be considered if acceptance will require substantial revisions of <br />drawings and specifications or both. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 PRODUCTS: