My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 January 2019 016400 SUBSTITUTIONS AND PRODUCT <br />OPTIONS-2 <br />and test data and pertinent reference standards. <br /> <br />3. For construction methods: <br /> <br />c. Detailed description of proposed method. <br />d. Working drawings illustrating methods. <br /> <br />3. Itemized comparison of proposed substitution with product specified. Comparison <br />shall include cost, differences in estimated life, estimated maintenance, <br />availability of spare parts and repair services, energy consumption, performance <br />capacity, salvageability, manufacturer's warranties and other material <br />differences. <br /> <br />4. Data relating to changes in construction schedule. <br /> <br />5. Accurate cost data on proposed substitution in comparison with product and <br />method specified except that cost data will not be required on substitutes <br />proposed as equal, equivalent or superior to specified brand names and for which <br />no request is made for price adjustment to the Subcontract. <br /> <br />6. Equitable adjustment and credit that the Contractor proposes to offer MDC if the <br />substitutions are not equal, equivalent or superior to specified brand names. <br /> <br />B. In making request for substitution, Contractor shall verify: <br /> <br />1. That he has personally investigated the proposed product and method and that to <br />the best of his knowledge, information and belief, the product and method is either <br />equivalent or superior to that product and method specified and that he will update <br />information as new or different data become known to him. <br /> <br />2. That he will furnish the same guarantee for substitution as he would for the product <br />and method specified. <br /> <br />3. That he will coordinate installation of the accepted substitution into the Work and <br />will make those changes required for the Work to be complete and operable. <br /> <br />4. That cost data is complete and includes related costs and excludes cost of <br />engineering redesign. <br /> <br />5. That he waives claims for additional time and costs related to the substitution, <br />which becomes apparent. <br /> <br />C. Amend and update list as changes concerning information on the list become known to him. <br /> <br />D. Substitutions will not be considered, if indicated or implied on Shop Drawings or Product <br />Data submittal for which no formal request for substitution has been submitted. Requests <br />for substitutions will not be considered if acceptance will require substantial revisions of <br />drawings and specifications or both. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 PRODUCTS:
The URL can be used to link to this page
Your browser does not support the video tag.