My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 21-1011 November 2024 017320 -1 <br />SECTION 017320 <br />SELECTIVE DEMOLITION <br />PART 1 - GENERAL <br /> <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br /> <br />1.2 SUMMARY <br />A. Section Includes: <br />1. Demolition and removal of selected portions of building or structure. <br /> <br />2. Demolition and removal of selected site elements. <br /> <br />3. Salvage of existing items to be reused or recycled. <br />B. Related Requirements: <br />1. Section 01100 "Summary" for restrictions on the use of the premises, Owner- <br />occupancy requirements, and phasing requirements. <br /> <br />1.3 DEFINITIONS <br />A. Remove: Detach items from existing construction and legally dispose of them off-site <br />unless indicated to be removed and salvaged or removed and reinstalled. <br />B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent <br />damage, and deliver to Owner. <br />C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and <br />reinstall where indicated. <br />D. Existing to Remain: Existing items of construction that are not to be permanently removed <br />and that are not otherwise indicated to be removed, removed and salvaged, or removed <br />and reinstalled. <br /> <br />1.4 MATERIALS OWNERSHIP <br /> <br />A. Unless otherwise indicated, demolition waste shall be recycled as described in these <br />Specifications. Items not required to be recycled are the property of the Contractor. <br /> <br />B. Historic items, relics, antiques, and similar objects including, but not limited to, <br />cornerstones and their contents, commemorative plaques and tablets, and other items of <br />interest or value to Owner that may be uncovered during demolition remain the property <br />of Owner. <br /> <br />1. Carefully salvage in a manner to prevent damage and promptly return to Owner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.