My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 092300 Gypsum Plastering-4 <br />2.6 FINISH-COAT PLASTER MATERIALS <br /> <br />A. Gypsum Neat Plaster: ASTM C 28/C 28M, for use with job-mixed aggregates. <br /> <br />1. Basis of Design Product: Subject to compliance with requirements, provide: <br /> <br />a. Manufacturer: United States Gypsum Company; Red Top Gauging Plaster <br />b. Architect approved equal. <br /> <br />B. Aggregates for Base-Coat Plasters: ASTM C 35, sand. <br /> <br />C. Lime: ASTM C 206, Type S, special finishing hydrated lime. <br /> <br />1. Basis of Design Product: Subject to compliance with requirements, provide: <br /> <br />a. Manufacturer: United States Gypsum Company; Ivory Finish Lime <br />b. Architect approved equal <br /> <br />2.4 PLASTER MIXES <br /> <br />A. Mixing: Comply with ASTM C 842 and manufacturer's written instructions for <br />applications indicated. <br /> <br />B. Mix Additives: Use accelerators and retarders, if required by Project conditions, <br />according to manufacturer's written instructions. <br />PART 3 - EXECUTION <br /> <br />3.1 EXAMINATION <br /> <br />A. Examine substrates and conditions, with Installer present, for compliance with <br />requirements for installation tolerances and other conditions affecting performance of the <br />Work. <br /> <br />B. Proceed with installation only after unsatisfactory conditions have been corrected. <br /> <br />3.2 PREPARATION <br /> <br />A. Protect adjacent work from soiling, spattering, moisture deterioration, and other harmful <br />effects caused by plastering. <br /> <br />3.3 INSTALLATION, GENERAL <br /> <br />A. Fire-Resistance-Rated Assemblies: Install components according to requirements for <br />design designations from listing organization and publication indicated on Drawings. <br /> <br />B. STC-Rated Assemblies: Install components according to requirements for design <br />designations from listing organization and publication indicated on Drawings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.