My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 092300 Gypsum Plastering-6 <br /> <br />1. Over Expanded-Metal Lath: <br /> <br />a. Scratch Coat: Gypsum neat plaster with job-mixed sand. <br />b. Brown Coat: Gypsum neat plaster with job-mixed sand. <br /> <br />D. Finish Coats: <br /> <br />1. Smooth-Troweled Finishes: <br /> <br />a. Materials: Gypsum gauging plaster and lime putty. <br />b. Locations: Provide smooth-troweled finish to match existing adjacent <br />construction. <br /> <br />2. Float Finishes: <br /> <br />a. Materials: Gypsum gauging plaster and lime putty. <br />b. Locations: Provide float finish to match existing adjacent construction. <br /> <br />3.7 PLASTER REPAIRS <br /> <br />A. Repair or replace work to eliminate cracks, dents, blisters, buckles, crazing and check <br />cracking, dry outs, efflorescence, sweat outs, and similar defects and where bond to <br />substrate has failed. <br /> <br />3.8 CLEANING AND PROTECTION <br /> <br />A. Remove temporary protection and enclosure of other work after plastering is complete. <br />Promptly remove plaster from door frames, windows, and other surfaces not indicated to <br />be plastered. Repair floors, walls, and other surfaces stained, marred, or otherwise <br />damaged during plastering. <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.