My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 21-1011 November 2024 017320 -4 <br />C. Survey existing conditions and correlate with requirements indicated to determine extent <br />of selective demolition required. <br /> <br />D. When unanticipated mechanical, electrical, or structural elements that conflict with <br />intended function or design are encountered, investigate and measure the nature and <br />extent of conflict. Promptly submit a written report to Architect. <br /> <br />E. Survey of Existing Conditions: Record existing conditions by use of preconstruction <br />photographs or preconstruction videotapes. <br /> <br />1. Comply with requirements specified elsewhere for Construction Progress <br />Documentation. <br /> <br />2. Inventory and record the condition of items to be removed and relocated. Provide <br />photographs or video of conditions that might be misconstrued as damage caused <br />by salvage operations. <br /> <br />3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS <br /> <br />A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and <br />protect them against damage. <br /> <br />1. Comply with requirements for existing services/systems interruptions specified in <br />Section 01110 "Summary of Work." <br /> <br />B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, <br />disconnect, and seal or cap off indicated utility services and mechanical/electrical systems <br />serving areas to be selectively demolished. <br /> <br />1. Building manager will arrange to shut off indicated services/systems when <br />requested by Contractor. <br /> <br />2. Arrange to shut off indicated utilities with utility companies. <br /> <br />3. If services/systems are required to be removed, relocated, or abandoned, provide <br />temporary services/systems that bypass area of selective demolition and that <br />maintain continuity of services/systems to other parts of building. <br /> <br />4. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC <br />systems, equipment, and components indicated to be removed. <br /> <br />a. Piping to Be Removed: Remove portion of piping indicated to be removed <br />and cap or plug remaining piping with same or compatible piping material. <br />b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with <br />same or compatible piping material. <br />c. Equipment to Be Removed: Disconnect and cap services and remove <br />equipment. <br />d. Equipment to Be Removed and Reinstalled: Disconnect and cap services <br />and remove, clean, and store equipment; when appropriate, reinstall, <br />reconnect, and make equipment operational. <br />e. Equipment to Be Removed and Salvaged: Disconnect and cap services <br />and remove equipment and deliver to Owner.
The URL can be used to link to this page
Your browser does not support the video tag.