My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 095126-1 <br />SECTION 095126 <br />WOODWORKS LINEAR VENEERED OPEN <br /> <br />PART 1 – GENERAL <br /> <br />1.1 RELATED DOCUMENTS <br /> <br />A. Drawings and general conditions of Contract, including General and Supplementary <br />Conditions and Divisions-1 Specification sections apply to work of this section. <br /> <br />1.2 SUMMARY <br /> <br />A. Section Includes: <br /> <br />1. WoodWorks Linear Veneered Open <br /> <br />2. Exposed grid suspension system. <br /> <br />3. Wire hangers, fasteners, main runners, cross tees, wall angle moldings and <br />accessories. <br /> <br />B. Related Sections: <br /> <br />1. Section 09 51 00 - Acoustical Ceiling Suspension Assembly <br /> <br />2. Section 09 22 16 - Non-Structural Metal Framing <br /> <br />3. Section 09 29 00 - Plaster and Gypsum Board <br /> <br />4. Divisions 15 – HVAC <br /> <br />5. Division 16 - Electrical Work <br /> <br />C. Alternates <br /> <br />1. Prior Approval: Unless otherwise provided for in the Contract documents, submit <br />proposed product substitutions no later than TEN (10) working days prior to the <br />date established for receipt of bids. Acceptability of a proposed substitution is <br />contingent upon the Architect’s review and acceptance. Approved products will <br />be set forth by the Addenda. If a substitution is included in a Bid and is not <br />approved by an Addendum, the specified products shall be provided as in place <br />of the substitute without additional compensation. <br /> <br />2. Submittals, which do not provide adequate data for the product evaluation, will <br />not be considered. The proposed substitution must meet all requirements of this <br />section, including but not necessarily limited to, the following: Single source <br />materials suppliers (if specified in Section 1.5); panel design, size, composition, <br />color, and finish; suspension system component profiles and sizes; compliance <br />with the referenced standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.