My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 017329 Cutting and Patching-1 <br /> <br /> <br />SECTION 017329 <br />CUTTING & PATCHING <br /> <br />PART 1 - GENERAL <br /> <br />1.1 REQUIREMENTS INCLUDED <br /> <br />A. Contractor responsibility: All cutting, fitting and patching, including attendant excavation <br />and backfill, required completing the work to: <br /> <br />1. Make its several parts fit together properly. <br />2. Uncover portions for the work to provide for the installation of ill-timed work. <br />3. Remove and replace defective work. <br />4. Remove and replace work not conforming to requirements of Contract <br />Documents. <br />5. Remove samples of installed work as specified for testing. <br />6. Remove routine penetrations of non-structural surfaces for installation of piping <br />and electrical conduits. <br /> <br />1.2 SUBMITALS <br /> <br />A. Submit a written request to the Representative well in advance of executing any cutting <br />or alteration which affects: <br /> <br />1. Work of the Owner or any separate contractor. <br />2. Structural value or integrity of any element of the Project. <br />3. Integrity or effectiveness of weather-exposed or moisture resistant elements or <br />systems. <br />4. Efficiency, operational life, maintenance or safety of operational elements. <br />5. Visual qualities of sight-exposed elements. <br />B. Include with each request: <br /> <br />1. Identification of the Project. <br />2. Description of affected work. <br />3. The necessity for cutting alteration or excavation. <br />4. Effect on work of Owner or any separate contractor, or on structural or <br />weatherproof integrity of Project. <br />5. Description of proposed work: <br />a. Scope of cutting, patching, alteration, or excavation. <br />b. Trades who will execute the work. <br />c. Products proposed to be used <br />d. Extent of refinishing to be done.
The URL can be used to link to this page
Your browser does not support the video tag.