My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 023000 Subsurface Investigation-4 <br /> <br />3.3 EXCAVATION FOR STRUCTURES <br /> <br />A. Excavate to indicated elevations and dimensions within a tolerance of plus or minus <br />1 inch. If applicable, extend excavations a sufficient distance from structures for <br />placing and removing concrete formwork, for installing services and other <br />construction, and for inspections. <br /> <br />1. Excavations for Footings and Foundations: Do not disturb bottom of <br />excavation. Excavate by hand to final grade just before placing concrete <br />reinforcement. Trim bottoms to required lines and grades to leave solid base <br />to receive other work. <br /> <br />3.4 EXCAVATION FOR WALKS AND PAVEMENTS <br /> <br />A. Excavate surfaces under walks and pavements to indicated lines, cross sections, <br />elevations, and subgrades. <br /> <br />3.5 EXCAVATION FOR UTILITY TRENCHES <br /> <br />A. Excavate trenches to indicated gradients, lines, depths, and elevations. <br /> <br />B. Excavate trenches to uniform widths to provide the following clearance on each side <br />of pipe or conduit. Excavate trench walls vertically from trench bottom to 12 <br />inches higher than top of pipe or conduit, unless otherwise indicated. <br /> <br />1. Clearance: 6 inches minimum for pipe or conduit, or one fourth of <br />pipe width. <br /> <br />C. Trench Bottoms: Excavate and shape trench bottoms to provide uniform, <br />continuous bearing and support of pipes and conduit. Remove projecting stones <br />and sharp objects along trench subgrade. <br /> <br />1. Excavate trenches 6 inches deeper than elevation required in rock or <br />other unyielding bearing material. <br /> <br /> <br />3.6 SUBGRADE INSPECTION <br /> <br />A. Proof-roll subgrade below building slabs and pavements with heavy pneumatic- <br />tired equipment to identify soft pockets and areas of excess yielding. Do not proof- <br />roll wet or saturated subgrades. <br /> <br />B. Reconstruct subgrades damaged by rain, accumulated water, or construction <br />activities, as directed by Architect, without additional compensation. <br /> <br />3.7 UNAUTHORIZED EXCAVATION <br /> <br />A. Fill unauthorized excavation under foundations or wall footings by extending bottom <br />elevation of concrete foundation or footing to excavation bottom, without altering
The URL can be used to link to this page
Your browser does not support the video tag.