My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:25:43 AM
Creation date
2/20/2025 9:25:17 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />21 <br />ITB 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />applicable). To enroll in E-Verify, employers should visit the E-Verify website (https://www.e- <br />verify.gov/employers/enrolling-in-e-verify) and follow the instructions. The contractor must, as <br />usual, retain the I-9 Forms for inspection. <br /> <br />2.25 VALUE ENGINEERING <br /> <br />The City is open to any meaningful value engineering that would reduce the overall cost without <br />compromising the integrity. Any innovative idea shall be included in the bid proposal. <br /> <br />2.26 HOURS OF CONSTRUCTION <br /> <br />The Contractor shall minimize the impact of this project on the general public ensuring that all <br />service interruptions are kept to a minimum and providing temporary services, structures, and <br />facilities as required. The existing service to the residents and businesses may not be interrupted <br />for more than 4 hours without written permission from the City. The Contractor shall perform <br />work between the hours 7:00 AM and 7:00 PM Monday through Thursday and 7:00 AM – 5:00 <br />PM on Fridays; and weekends with permission or as restricted by the local jurisdiction. Work <br />outside these hours or on weekends and holidays is prohibited without permission from the City. <br /> <br />2.27 WARRANTY <br /> <br />All Capital Equipment supplied and installed for this Project shall be warranted to be free of <br />defects for a period of one (1) year after completion of the Project. <br /> <br />2.28 UNITED STATES-PRODUCED IRON AND STEEL PRODUCTS <br /> <br />Pursuant to Section 255.0993, Florida Statutes, and subject to the exclusions set forth therein, <br />any iron or steel product permanently incorporated in a public works project must be produced <br />in the United States if the public works project constitutes “an activity paid for with any state <br />appropriated funds or state funds administered by a governmental entity which consists of the <br />construction, maintenance, repair, renovation, remodeling, or improvement of a building, road, <br />street, sewer, storm drain, water system, site development, irrigation system, reclamation <br />project, gas or electrical distribution system, gas or electrical substation, or other facility, project, <br />or portion thereof owned in whole or in part by any governmental entity.” To the extent any Work <br />or Services provided for in this Agreement constitutes a public works project, as defined in Section <br />255.0993, Florida Statutes, subject to the exclusions contained therein, any iron or steel product <br />permanently incorporated in the Work or Services must be produced in the United States. <br /> <br />2.28 PUBLIC RECORDS LAW <br /> <br />The City is subject to Chapter 119, Florida Statutes, “Public Records Law.” No claim of <br />confidentiality or proprietary information in all or any portion of a response will be honored unless <br />a specific exemption from the Public Law exists and is cited in the response. An incorrectly claimed <br />exemption does not disqualify the firm, only the exemption claimed. Contractor acknowledges <br />the public shall have access at all reasonable times, to all documents and information pertaining <br />to City’s contracts, subject to the provisions of Chapter 119, Florida Statutes, and agrees to allow
The URL can be used to link to this page
Your browser does not support the video tag.