Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />utility lines, wires, poles, pipe, and any other equipment of every kind and nature. <br />Unforeseen conditions or situations which cannot be reasonably inferred from the <br />contract documents will be individually evaluated and charged to the contract <br />contingency. <br />7.16.7 The Contractor shall be responsible for receiving, off-loading, storing and securing <br />materials supplied by utility companies in furtherance of the Work. Any damage, loss, or <br />deterioration to said materials shall be the sole responsibility of the Contractor. <br />7.16.8 In the event the Contractor damages existing utility facilities while performing the <br />Work, the Contractor shall immediately repair said damages at the expense of the <br />Contractor, and in a manner acceptable to the City. Contractor shall maintain the materials <br />and equipment necessary on the Project site to ensure that remedial repairs to utility <br />facilities can be effectuated without delay. <br />7.16.9 The Contractor shall immediately notify the City of any unforeseen condition or <br />deviation from the plans that the Contractor encounters in performance of the Work. The <br />Contractor's responsibility to notify the City of said unforeseen condition or deviation <br />applies in all circumstances, and is not contingent upon whether the Contractor intends to <br />make a claim for Concealed and Unknown Conditions pursuant to Section 8.3.3. <br />7.16.10 After first giving at least seventy-two (72) hours written notice to the City <br />and the City's Representative, the Contractor shall conduct any and all testing required <br />under the Contract Documents and report the results of same to the City and the City's <br />Representative within twenty-four (24) hours of receipt unless the City or the City's <br />Representative instructs otherwise. The Contractor shall also cooperate with the City and <br />the City's Representative in the event the City or the City's Representative elects to <br />conduct testing for any purpose. The Contractor shall make the site, or any relevant <br />portion thereof, available for such testing by the City or the City's Representative and the <br />Contractor shall so schedule and coordinate its work so as not to interfere with any <br />testing by the City or the City's Representative. When requested by the City or the <br />City's Representative the Contractor shall furthermore uncover Work and otherwise <br />assist in testing as may be required by the City or the City's Representative. The <br />services requested by the City which are required to be provided by an Independent <br />Testing Laboratory shall be paid by the City unless otherwise stated in the Contract <br />Documents. Contractor may not rely upon any testing performed by the City or the City's <br />Representative but shall remain solely responsible for insuring compliance with all <br />Contract Documents and testing requirements. The Contractor shall be responsible for <br />the payment of any of its testing. <br />8.1 City's Consultant Engineer <br />8.1.1 The City's Consultant Engineer for this project is Calvin Giordano & <br />Associates. In the event the City should find it necessary or convenient to replace the <br />COMTECH ENGINEERING, INC. 20 <br />