Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />by the Contractor to the City's Representative with full explanations and <br />justifications for consideration in preparing a change order to the Contract. <br />10.3.2.5 Contractor shall allow twenty-one (2 1) calendar days for the City's <br />Representative to review and respond to the City on Contractor submitted Requests <br />for Change Order pricing and Contractor submitted pricing for City initiated <br />proposal requests. This review time is only for correctly submitting pricing. <br />Submitted pricing found not to be in correct format, or containing pricing that <br />relates to Work clearly not part of the change, or contains Sub- Contractor pricing <br />not in the correct format, or' contains Sub -Contractor pricing that relates to Work <br />clearly not part of the change, will not be reviewed and returned to the Contractor <br />for proper submission and as such, no Contractor claims for delay will be accepted <br />as a result of extended response time due to improper pricing submission. <br />10.3.2.6 The City's Representative will review properly submitted Contractor <br />pricing and compare submitted pricing with published pricing data contained in <br />the Building Cost Data, Mechanical Cost Data and Electrical Cost Data, latest <br />edition, as published by R.S. Means Company, Inc. Contractor submitted pricing <br />found to be in excess of five (5%) percent above the stated published pricing will <br />not be accepted and as such, no Contractor claims for delay will be accepted as a <br />result of extended response time due to excessive pricing submittal by the <br />Contractor. <br />10.3.3 The value of any change ordered under the Contract for extra work or <br />any reductions in work required, shall be determined under one or more of the following <br />procedures before a written change order is issued. <br />10.3.3.1 By Unit Price named in the contract or subsequently agreed upon <br />by the City and the Contractor, which prices shall include Contractor's <br />overhead and profit. <br />10.3.3.2 By Lump Sum Price agreed upon by the City and the Contractor, <br />which price shall include overhead and profit. A breakdown of the estimated <br />costs comprising the lump sum price may be required by the City's <br />Representative for review. Percentage for overhead and profit shall be <br />determined in accordance with the method listed described under Overhead <br />and Profit below. <br />10.3.3.3 By a Cost -Plus Price on total actual costs, plus an added <br />percentage, all determined as described under Overhead and Profit below. <br />10.3.3.4 Overhead and Profit <br />(a)Subcontractor's overhead, including supervision and the furnishing, use and <br />maintenance of small tools and ordinary equipment incidental to and required for <br />the Work shall be just and fully compensated for by adding an amount equal to <br />FIVE PERCENT (51/o) of the sum of material and labor costs as defined under <br />Subcontractor's profit below, but excluding documented equipment rental costs. <br />COMTECH ENGINEERING, INC. 26 <br />