My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3779
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 4:13:12 PM
Creation date
2/24/2025 4:03:15 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3779
Date (mm/dd/yyyy)
01/16/2025
Description
Approving an Agreement with Comtech Engineering, Inc., for the Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />by the Contractor to the City's Representative with full explanations and <br />justifications for consideration in preparing a change order to the Contract. <br />10.3.2.5 Contractor shall allow twenty-one (2 1) calendar days for the City's <br />Representative to review and respond to the City on Contractor submitted Requests <br />for Change Order pricing and Contractor submitted pricing for City initiated <br />proposal requests. This review time is only for correctly submitting pricing. <br />Submitted pricing found not to be in correct format, or containing pricing that <br />relates to Work clearly not part of the change, or contains Sub- Contractor pricing <br />not in the correct format, or' contains Sub -Contractor pricing that relates to Work <br />clearly not part of the change, will not be reviewed and returned to the Contractor <br />for proper submission and as such, no Contractor claims for delay will be accepted <br />as a result of extended response time due to improper pricing submission. <br />10.3.2.6 The City's Representative will review properly submitted Contractor <br />pricing and compare submitted pricing with published pricing data contained in <br />the Building Cost Data, Mechanical Cost Data and Electrical Cost Data, latest <br />edition, as published by R.S. Means Company, Inc. Contractor submitted pricing <br />found to be in excess of five (5%) percent above the stated published pricing will <br />not be accepted and as such, no Contractor claims for delay will be accepted as a <br />result of extended response time due to excessive pricing submittal by the <br />Contractor. <br />10.3.3 The value of any change ordered under the Contract for extra work or <br />any reductions in work required, shall be determined under one or more of the following <br />procedures before a written change order is issued. <br />10.3.3.1 By Unit Price named in the contract or subsequently agreed upon <br />by the City and the Contractor, which prices shall include Contractor's <br />overhead and profit. <br />10.3.3.2 By Lump Sum Price agreed upon by the City and the Contractor, <br />which price shall include overhead and profit. A breakdown of the estimated <br />costs comprising the lump sum price may be required by the City's <br />Representative for review. Percentage for overhead and profit shall be <br />determined in accordance with the method listed described under Overhead <br />and Profit below. <br />10.3.3.3 By a Cost -Plus Price on total actual costs, plus an added <br />percentage, all determined as described under Overhead and Profit below. <br />10.3.3.4 Overhead and Profit <br />(a)Subcontractor's overhead, including supervision and the furnishing, use and <br />maintenance of small tools and ordinary equipment incidental to and required for <br />the Work shall be just and fully compensated for by adding an amount equal to <br />FIVE PERCENT (51/o) of the sum of material and labor costs as defined under <br />Subcontractor's profit below, but excluding documented equipment rental costs. <br />COMTECH ENGINEERING, INC. 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.