My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3779
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 4:13:12 PM
Creation date
2/24/2025 4:03:15 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3779
Date (mm/dd/yyyy)
01/16/2025
Description
Approving an Agreement with Comtech Engineering, Inc., for the Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />teams and foremen are actually employed on the extra work required, including <br />the net cost of insurance, social security and Worker's Compensation. Records <br />in proper form shall be maintained and be made available to the <br />Engineer/Architect and the City at all times. <br />10.3.3.8 Rentals for special equipment or machinery such as power driven <br />roller, tractors, trucks, shovels, drills, mixers, pumps, hoists, etc. required for <br />the economicalperformance ofthe work at reasonable rental prices agreed upon <br />before work commences, shall be allowed to the Contractor and subcontractors <br />by the City's Representative and the City for each and every hour such special <br />equipment is in use on the particular work. To the sum of such equipment <br />rentals, no additional percentage shall be added. <br />10.3.3.9 Owned Equipment for certain owned heavy or specialized <br />equipment (defined as tools and equipment with an individual purchase cost of <br />more than Ten Thousand Dollars ($10,000)) brought on to the job site specifically <br />for change order work shall be valued at 75 percent of the monthly rental divided <br />by 176 to arrive at a maximum hourly rate to be applied to the hours the equipment <br />is used performing the change order work. Fuel and an operator necessary to utilize <br />the equipment will be considered as a separate direct cost associated with the <br />change order work. No recovery will be allowed for heavy or specialized <br />equipment that is already on the jobsite and is necessary to complete work of the <br />original contract. No recovery will be allowed for hand tools, power tools, minor <br />equipment, work vehicles (including pickup trucks and cargo vans), simple <br />scaffolds, etc. The longest period of time that the equipment is to be required for <br />the work will be the basis for pricing. Downtime due to repairs, maintenance and <br />weather delays will not be allowed. <br />10.4 Minor Changes <br />10.4.1 The City's Representative, after first obtaining express written approval <br />from the City, shall have authority to order minor changes in the Work not involving <br />a change in the Contract Price or an extension of the Contract Time and not inconsistent <br />with the intent of this Contract. Such minor changes shall be made by written Field <br />Order, and shall be binding upon the City and the Contractor. The Contractor shall <br />promptly carry out such written Field Orders. <br />10.5 Effect of Executed Change Order <br />10.5.1 The execution of a Change Order by the Contractor shall constitute <br />conclusive evidence of the Contractor's agreement to the ordered changes in the Work, <br />this Contract as thus amended, the Contract Price and the Contract Time. The <br />Contractor, by executing the Change Order, waives and forever releases any claim <br />against the City for additional time or compensation for matters relating to or arising <br />out of or resulting from the Work included within or affected by the executed Change <br />Order. <br />COMTECH ENGINEERING, INC. . 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.