My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3779
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 4:13:12 PM
Creation date
2/24/2025 4:03:15 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3779
Date (mm/dd/yyyy)
01/16/2025
Description
Approving an Agreement with Comtech Engineering, Inc., for the Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />(c) - Absent agreement to the amount due to the Contractor, the City shall <br />pay the Contractor the following amounts: <br />(i) Contract prices for labor, materials, equipment and other <br />services accepted under this Contract; <br />(ii) Reasonable costs incurred in preparing to perform and in <br />performing the terminated portion of the Work, and in terminating the <br />Contractor's performance, plus a fair and reasonable allowance for <br />overhead in the amount of seven percent (70/6) of the Contractor's direct <br />costs, and a reasonable allowance for profit in the amount of ten percent <br />(10%) of the Contractor's direct costs (such profit shall not include <br />anticipated profit or consequential damages); and profit thereon (such profit <br />shall not include anticipated profit or consequential damages); provided <br />however, that if it appears that the Contractor would have not profited or <br />would have sustained a loss if the entire Contract would have been <br />completed, no profit shall be allowed or included and the amount of <br />compensation shall be reduced to reflect the anticipated rate of loss, if any; <br />(iii) Reasonable costs of settling and paying claims arising out of <br />the termination of subcontracts or orders pursuant to Subparagraph <br />12.2.1.2 of this Paragraph. These costs shall not include amounts paid <br />in accordance with other provisions hereof. <br />The total sum to be paid the Contractor under this Subparagraph 12.2.1 shall <br />not exceed the total Contract Price, as properly adjusted, reduced by the <br />amount of payments otherwise made, and shall in no event include <br />duplication of payment. <br />12.2.2 For Cause <br />12.2.2.1 If the Contractor refuses or fails to prosecute the Work in a timely <br />manner, supply enough properly skilled workers, administrative, managerial and <br />supervisory personnel or proper equipment or materials, or if it fails to make <br />prompt payment to Subcontractors or for materials or labor, or persistently <br />disregards laws, ordinances, rules, regulations or orders of any public authority <br />having jurisdiction, or otherwise is guilty of a substantial violation of a material <br />provision of this Contract, then the City may by written notice to the Contractor, <br />without prejudice to any other right or remedy, terminate the employment of the <br />Contractor and take possession of the site and of all materials, equipment, tools, <br />construction equipment and machinery thereon owned by the Contractor and may <br />finish the Work by whatever methods it may deem expedient. In such case, the <br />Contractor shall not be entitled to receive any further payment until the Work is <br />finished. <br />COMTECH ENGINEERING, INC. 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.