Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />sales and use tax savings of purchase of property, materials, etc., shall be credited to the City and <br />the amount of the Agreement will be reduced in the full amount of savings which are affected by <br />the omission of payment of sales and use taxes. <br />ARTICLE Ill <br />CONTRACT IMUE <br />3.1 Time <br />3.1.1 The Contractor shall neither commence any work, nor enter a City work <br />premise, until a written Notice to Proceed (NTP) from the City directing the Contractor to <br />proceed with the work has been received by the Contractor from the City Manager or <br />designee; provided however, that such notification shall be superseded by any emergency <br />work that may be required in accordance with provisions included elsewhere in the <br />Contract Documents. In addition to the written NTP, the Contractor must supply the City <br />with the required insurance and bond documents. The Project shall be substantially <br />completed within two -hundred and seventy (270) calendar days from the Project <br />initiation specified in the Notice to Proceed and final completion shall be thirty (30) <br />calendar days after Substantial Completion. The total three -hundred (300) calendar <br />days include weekend days and holidays. For the purposes of this Project, Final <br />Completion shall be defined at that point after which the City Engineer or their <br />representative, have made and approved the Final Inspection and the Punch List has been <br />completed, and all deliverables have been provided to the City. <br />3.2 Notice to Proceed <br />3.2.1 Once a Notice to Proceed has been issued, the Contractor shallbe responsible <br />for the timely and successful completion of the Work and shall endeavor to provide <br />all applicable agencies having jurisdiction with all the required documentation needed to <br />successfully and timely continue the progress of the Work. This may include, but is <br />not limited to providing all necessary documentation in the form of shop drawings, <br />clarifications, calculations, technical data, protocols, product approvals, etc. <br />3.2.2 Under no circumstances will the City accept claims or be responsible for <br />delays arising from failed, unsuccessful, untimely, or late inspections, or rejections of <br />inspected Work due to the fault of the Contractor for not supplying all of the necessary <br />documentation in the forms required or requested by the City, the City's Representative, <br />or the City's Consultant Engineer. <br />3.3 Time is of the Essence <br />3.3.1 All limitations of time set forth in the Contract Documents are of the essence of <br />this Contract. <br />3.4 The Terms of Sections 1.8, 7.15, and 7.5 entitled "Compliance with Laws", <br />"Indemnity" and "Warranty", respectively, shall survive the expiration or termination of this <br />Agreement. <br />COMTECH ENGINEERING, INC. <br />