My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3779
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2025 4:13:12 PM
Creation date
2/24/2025 4:03:15 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3779
Date (mm/dd/yyyy)
01/16/2025
Description
Approving an Agreement with Comtech Engineering, Inc., for the Golden Shores Pump Station Rehabilitation Project.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />sales and use tax savings of purchase of property, materials, etc., shall be credited to the City and <br />the amount of the Agreement will be reduced in the full amount of savings which are affected by <br />the omission of payment of sales and use taxes. <br />ARTICLE Ill <br />CONTRACT IMUE <br />3.1 Time <br />3.1.1 The Contractor shall neither commence any work, nor enter a City work <br />premise, until a written Notice to Proceed (NTP) from the City directing the Contractor to <br />proceed with the work has been received by the Contractor from the City Manager or <br />designee; provided however, that such notification shall be superseded by any emergency <br />work that may be required in accordance with provisions included elsewhere in the <br />Contract Documents. In addition to the written NTP, the Contractor must supply the City <br />with the required insurance and bond documents. The Project shall be substantially <br />completed within two -hundred and seventy (270) calendar days from the Project <br />initiation specified in the Notice to Proceed and final completion shall be thirty (30) <br />calendar days after Substantial Completion. The total three -hundred (300) calendar <br />days include weekend days and holidays. For the purposes of this Project, Final <br />Completion shall be defined at that point after which the City Engineer or their <br />representative, have made and approved the Final Inspection and the Punch List has been <br />completed, and all deliverables have been provided to the City. <br />3.2 Notice to Proceed <br />3.2.1 Once a Notice to Proceed has been issued, the Contractor shallbe responsible <br />for the timely and successful completion of the Work and shall endeavor to provide <br />all applicable agencies having jurisdiction with all the required documentation needed to <br />successfully and timely continue the progress of the Work. This may include, but is <br />not limited to providing all necessary documentation in the form of shop drawings, <br />clarifications, calculations, technical data, protocols, product approvals, etc. <br />3.2.2 Under no circumstances will the City accept claims or be responsible for <br />delays arising from failed, unsuccessful, untimely, or late inspections, or rejections of <br />inspected Work due to the fault of the Contractor for not supplying all of the necessary <br />documentation in the forms required or requested by the City, the City's Representative, <br />or the City's Consultant Engineer. <br />3.3 Time is of the Essence <br />3.3.1 All limitations of time set forth in the Contract Documents are of the essence of <br />this Contract. <br />3.4 The Terms of Sections 1.8, 7.15, and 7.5 entitled "Compliance with Laws", <br />"Indemnity" and "Warranty", respectively, shall survive the expiration or termination of this <br />Agreement. <br />COMTECH ENGINEERING, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.