Laserfiche WebLink
Design Fees <br />Design Permit Drawings <br />Labor <br />Mobilization <br />Permit process <br />Permit Processing <br />Inspections <br />Obtain final inspections <br />Permit process <br />FDOT permit process <br />City fees <br />FDOT Permit Fees. <br />City fees <br />City permit fees will be paid by the City. <br />City MOT costs for police patrol will be <br />paid by the City. <br />Note: Additional charges may apply <br />depending on the ROW permit requirements. <br />Final designs in scale must be provide by <br />the City. <br />We only run up to 5' of electric. <br />Deposit will be required as follows: <br />- No deposit to initiate the project. <br />William Lehman Causeway (1) <br />20% -After Permit Approval. <br />30%- After each sign or group of signs are <br />manufactured, approved, and inspected by <br />the city. <br />50% -Upon completion of each sign or group <br />of signs are installed. <br />Island Median Welcome Signs (2) <br />20% -After Permit Approval. <br />30%- After each sign or group of signs are <br />manufactured, approved, and inspected by <br />the city. <br />50% -Upon completion of each sign or group <br />of signs are installed. <br />Sunny Isles Blvd. Sign (1) <br />20% -After Permit Approval. <br />30%- After each sign or group of signs are <br />manufactured, approved, and inspected by <br />the city. <br />50% -Upon completion of each sign or group <br />of signs are installed. <br />Government Center Monument (1) <br />20% -After Permit Approval. <br />30%- After each sign or group of signs are <br />manufactured, approved, and inspected by <br />the city. <br />19 <br />480.00 <br />9,120.00 <br />1 <br />10,000.00 <br />10,000.00 <br />1 <br />9,000.00 <br />9,000.00 <br />1 <br />8,500.00 <br />8,500.00 <br />1 <br />9,000.00 <br />9,000.00 <br />1 <br />10,000.00 <br />10,000.00 <br />1 <br />0.00 <br />