My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3799
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3799
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 11:56:34 AM
Creation date
2/26/2025 4:31:17 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3799
Date (mm/dd/yyyy)
02/20/2025
Description
Approving Agreement w/ Neon Signs Solutions, Inc., for the removal, fabrication, & installation of Monument Signs throughout the City.
Supplemental fields
Expiration Date
2/20/2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design Fees <br />Design Permit Drawings <br />Labor <br />Mobilization <br />Permit process <br />Permit Processing <br />Inspections <br />Obtain final inspections <br />Permit process <br />FDOT permit process <br />City fees <br />FDOT Permit Fees. <br />City fees <br />City permit fees will be paid by the City. <br />City MOT costs for police patrol will be <br />paid by the City. <br />Note: Additional charges may apply <br />depending on the ROW permit requirements. <br />Final designs in scale must be provide by <br />the City. <br />We only run up to 5' of electric. <br />Deposit will be required as follows: <br />- No deposit to initiate the project. <br />William Lehman Causeway (1) <br />20% -After Permit Approval. <br />30%- After each sign or group of signs are <br />manufactured, approved, and inspected by <br />the city. <br />50% -Upon completion of each sign or group <br />of signs are installed. <br />Island Median Welcome Signs (2) <br />20% -After Permit Approval. <br />30%- After each sign or group of signs are <br />manufactured, approved, and inspected by <br />the city. <br />50% -Upon completion of each sign or group <br />of signs are installed. <br />Sunny Isles Blvd. Sign (1) <br />20% -After Permit Approval. <br />30%- After each sign or group of signs are <br />manufactured, approved, and inspected by <br />the city. <br />50% -Upon completion of each sign or group <br />of signs are installed. <br />Government Center Monument (1) <br />20% -After Permit Approval. <br />30%- After each sign or group of signs are <br />manufactured, approved, and inspected by <br />the city. <br />19 <br />480.00 <br />9,120.00 <br />1 <br />10,000.00 <br />10,000.00 <br />1 <br />9,000.00 <br />9,000.00 <br />1 <br />8,500.00 <br />8,500.00 <br />1 <br />9,000.00 <br />9,000.00 <br />1 <br />10,000.00 <br />10,000.00 <br />1 <br />0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.