Laserfiche WebLink
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 02510-2 <br />• Material certification for polymeric stabilizing sand <br />• Material certification for masonry sand <br />• Concrete specifications from supplier <br />• Manufacturer’s cut sheet for joint materials <br />• Manufacturer’s cut sheet for dowels <br />• Manufacturer’s cut sheet for edge restraints <br /> <br />PART 3 EXECUTION <br /> <br />3.1 CONSTRUCTION METHODS <br /> <br />The construction of the processed aggregate and concrete base material supporting the brick pavers <br />shall be in accordance with Technical Specification 02510 for concrete sidewalks. <br /> <br />The area of the mortar set brick pavers shall be excavated to a depth of approximately 16 inches. <br /> <br />Where the plans specify mortar set brick, the bricks shall be installed on 8 inches of compacted processed <br />aggregate base and 5 inches of Portland Cement Concrete installed monolithically with the adjacent <br />sidewalk as shown in the plans and details. All mortar set bricks shall be set on a bed of mortar. All joints <br />shall be mortared, being careful not to get mortar on exposed faces of brick. <br />There shall be no expansion joint between the concrete sidewalks and the brick pavers. Transverse <br />expansion joints in the concrete sidewalks shall be carried through the concrete base and the brick pavers. <br />The transverse expansion joints shall also be carried through the brick pavers. Transverse dummy joints <br />in the concrete sidewalk shall not be carried through the concrete base under the brick pavers. An <br />expansion joint shall be made between the granite curb and concrete/brick face. <br /> <br />Where the plans specify dry set brick, they shall be installed on 8 inches of compacted processed <br />aggregate with filter fabric placed on top of the aggregate. The leveling course on top of the filter fabric <br />shall consist of a minimum ¾ inches (maximum 1 inch) of compacted crushed stone dust. When placed, <br />the bricks shall tightly about each other. Exposed edges of bricks shall be set on a plastic angle edge <br />restraint. The final setting of brick shall be with a plate compactor taking care to have sufficient material <br />to not damage the brick. After compacting with masonry sand, the area shall be flushed with water to <br />ensure that joints have been filled. Any area that shows gaps in the joints shall be recompacted and <br />appropriately swept, misted, or flushed. All joints shall be filled with commercial grade crushed stone <br />dust, masonry sand, or commercial grade polymeric stabilizing sand as shown on the plans or as directed <br />by the Engineer. <br /> <br />If the polymeric sand manufacturer specifies a water mist for setting the joints, all the brick and adjacent <br />areas shall be swept clear of all polymeric sand residue. <br />END OF SECTION