Addendum # 1 City of Sunny Isles Response-RFI Sheet
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Addendum # 1 City of Sunny Isles Response-RFI Sheet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 12:55:54 PM
Creation date
3/10/2025 12:51:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
87 Olexandr <br />Kaltsev ELECTRICAL Electrical demolition information is limited. Who is responsible for disposal and <br />removal of the existing switchboard. <br />As the demolition of the existing switchboard is shown on the electrical drawings <br />it is intended to be the responsibility of the electrical contractor. Coordinate with <br />GC as required for full removal and disposal. <br />88 Olexandr <br />Kaltsev E602 ELECTRICAL/ <br />ARCHITECTURE <br />Drawing E602 calls out a raised floor for this facility. There is no mention of raised <br />floors in the architectural. Please confirm if this is valid. <br />Reference to raised floor will be removed. This was reminscient of previous <br />design consideration. <br />89 Olexandr <br />Kaltsev ELECTRICAL Please clarify the rough-in requirements for TV Outlet Locations.Plywood backing to be installed <br />90 Olexandr <br />Kaltsev ELECTRICAL Rooms 12,13,and 14 call out Furniture Keynote, however there are no power <br />feeds or devices shown. Please clarify. <br />Power feeds and devices for rooms 13 and 14 shall be replicated and extended as <br />shown in Room 12. <br />91 Olexandr <br />Kaltsev ELECTRICAL <br />Please confirm that the symbol shown in rooms Admin 005 and 006 is intended <br />to show a wall furniture feed. If so, please confirm 1" conduit is adequate for the <br />LV wiring rough in at this location. <br />Confirmed <br />92 Olexandr <br />Kaltsev <br />CITY OF SUNNY <br />ISLES BEACH <br />Will VE options for long lead time general items be accepted if they have shorter <br />lead times and are equivalent (tile etc)YES <br />93 Olexandr <br />Kaltsev <br />CITY OF SUNNY <br />ISLES BEACH <br />Stormwater Paving & Grading - The grading plan does not clearly show the tie-in <br />elevations between proposed and existing stormwater structures. Can you <br />confirm the intended flow direction and whether any modifications are required <br />for proper drainage? <br />NO DRAINAGE MODIFICATIONS REQUIRED <br />94 Olexandr <br />Kaltsev <br />CITY OF SUNNY <br />ISLES BEACH <br />Tree Protection - Certain trees are marked for protection. What specific <br />protective measures (e.g., fencing, root zone protection) are requested/required <br />by the city? <br />FENCING <br />95 Olexandr <br />Kaltsev <br />Section 4.0 & Sheet <br />S-01 GEOTECHNICAL <br />GeoTech Report - Foundation Compatibility - The geotechnical report <br />recommends deep foundations (helical piers) to match the existing structure’s <br />foundation and avoid differential settlement . Can the structural engineer <br />confirm the design criteria for helical pier spacing, depth variations, and possible <br />adjustments due to field conditions? Should additional subsurface investigations <br />be conducted before finalizing pile locations to mitigate potential variability in <br />soil conditions? <br />Helical pile foundations have been designed based on the recommendations as <br />prepared but the geotechnical report prepared by UES dated March 29, 2024. <br />96 Olexandr <br />Kaltsev A-700 CIVIL/ <br />ARCHITECTURE <br />Groundwater Table Management & Excavation Impact - Groundwater was <br />encountered at 5'1" to 5'4" below grade during testing . The proposed excavation <br />depths for utilities, foundations, and drainage structures are not clearly <br />coordinated with this groundwater elevation. Dewatering requirements and <br />potential buoyancy issues for underground structures are not addressed Will <br />temporary dewatering be required for foundation installation and underground <br />utility work? Are waterproofing or anti-buoyancy measures required for <br />stormwater structures or below-grade slabs? Can a monitoring program be <br />implemented to track seasonal fluctuations in groundwater levels? <br />GC means and methods shall provide the watering measures as needed. Grease <br />trap and solid interceptor include deadman anchors.