My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERNEST
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
ERNEST CONSTRUCTION FL INC
>
ERNEST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:01:39 PM
Creation date
3/10/2025 12:59:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEBRIS REMOVAL & DEMOLITION <br /> PROPOSAL <br /> Project: City of Sunny Isles Beach – City Annex Building Construction <br /> Renovations <br /> Location: 178th St. between Atlantic Blvd. & Collins Ave, Sunny Isles <br /> Beach, FL 33014 <br /> 1. Overview <br /> This proposal outlines the scope of work, methodology, and timeline for the demolition and <br /> debris removal required to facilitate the relocation of the City of Sunny Isles Beach Public <br /> Department. Our team is committed to executing this project with efficiency, safety, and minimal <br /> disruption to the surrounding community. <br /> 2. Scope of Work <br /> The project will be completed in four key phases: <br /> ● Site Preparation (5 Days): Installation of safety barriers, signage, and securing <br /> necessary permits. <br /> ● Demolition (15 Days): Controlled deconstruction and removal of designated structures, <br /> pavement, and utilities. <br /> ● Debris Removal (10 Days): Segregation, transportation, and disposal of construction <br /> waste per regulatory requirements. <br /> ● Final Cleanup & Inspection (5 Days): Grading and preparation of the site for future <br /> development. <br /> 3. Demolition Plan <br /> 3.1 Structural Demolition <br /> ● Building Demolition (10 Days): Sequential dismantling of existing structures to mitigate <br /> impact on adjacent areas. <br /> ● Foundation Removal (5 Days): Excavation and removal of concrete footings and slabs. <br /> Ernest Energy Inc. ITB 250101
The URL can be used to link to this page
Your browser does not support the video tag.