Laserfiche WebLink
Conference Room Furniture $13,412.58 <br />VIV Chairs - Replace Line $22,243.68 <br />Task Seating Aeron $8,377.60 <br />Task Seating Versus $15,401.25 <br />Signage $28,500.00 <br />Not Applicable for this scope of work <br />HVAC Equipment $125,908.57 <br />Air Distribution $195,945.65 <br />Underground $5,860.96 <br />Piping/Drainage $47,398.56 <br />Plumbing Fixtures $11,593.91 <br />Plumbing Equipment $21,217.38 <br />General Conditions $44,669.88 <br />Insulation $4,129.59 <br />Generator/ATS $102,529.99 <br />Distribution Equipment $20,425.78 <br />Feeders $64,089.99 <br />Site Lighting $1,569.59 <br />Site Lighting Branch $799.27 <br />Lighting Fixtures $137,311.07 <br />Lighting Branch $12,901.98 <br />Lighting Controls $17,007.46 <br />Devices $19,808.21 <br />Furniture/ Floor Duct Sytem $17,385.54 <br />Floorboxes $5,856.00 <br />Branch $14,324.47 <br />HVAC / Mechanical Circuits $13,270.80 <br />Teledata Conduit $10,902.46 <br />Teledata Wiring $32,355.35 <br />Fire Alarm $61,453.99 <br />Security/CCTV $2,776.32 <br />Access Control $4,108.45 <br />Lightning Protection $23,006.43 <br />Grounding $9,685.66 <br />General Conditions $3,998.81 <br />Insurance %lump 1.0%$29,852.83 <br />Bond %lump 0.7%$20,896.98 <br />Overhead & Profit lump 5.0%$149,264.15 <br /> $/sf $342.21 <br />$260,302.41 <br />13 SPECIAL CONSTRUCTION <br />$28,500.00 <br />14 CONVEYING SYSTEMS <br />$-   <br />15 MECHANICAL <br />$456,724.50 <br />16 ELECTRICAL <br />$575,567.62 <br />Sub Total $2,985,283.03 <br />GRAND TOTAL =$3,185,296.99