no item unit quantity price subtotal
<br />1 GENERAL REQUIREMENTS
<br />Supervision and project management 80,250.00$
<br />Site labor 21,400.00$
<br />Software 3,210.00$
<br />Shop drawings 8,560.00$
<br />Printing 1,016.50$
<br />Temporary fence 16,050.00$
<br />Permit Fees 10,700.00$
<br />Testing Laboratory Services 18,168.60$
<br />Survey and As-builts 8,560.00$
<br />Maintenance of Traffic (Barricades and signs) 5,350.00$
<br />Temp Facilities (Fence, toilet, Electrical, Water Meter) 7,805.65$
<br />Trash and Debris Disposal (Dumpster included) 32,100.00$
<br />Final Cleaning (Detail cleaning at project completion) 6,420.00$
<br />Side Protection (Elevator, hallway and site protection) 5,885.00$
<br />Pressure Cleaning 2,675.00$
<br />228,150.75$
<br />2 SITE WORK
<br />Demolition 86,775.00$
<br />Termite Treatment 1,500.00$
<br />Paving & Grading (Paver & Striping Included) 132,825.00$
<br />Landscape (Tree Protection / Tree Removal / New Royal Palm Tree) 14,625.00$
<br />235,725.00$
<br />3 CONCRETE
<br />Shell - Structure Concrete (Foundation / Slabs / Beams / CMU / Columns / Roof ) 423,765.00$
<br />Pre-Engineered Wood Trusses 5,380.00$
<br />Piling 53,130.00$
<br />Concret Cutting and Patching 6,665.00$
<br />488,940.00$
<br />4 MASONRY
<br />Masonry Walls Included (Concrete)
<br />Counter Tops 6,360.00$
<br />6,360.00$
<br />5 METALS
<br />Structural Steel Columns 38,130.00$
<br />Ladder 10,050.00$
<br />Dumpster Fence 10,755.00$
<br />58,935.00$
<br />6 WOOD & PLASTIC
<br />Exterior Cladding 117,395.00$
<br />Millwork (Storage / Breakroom Kitchen) 32,150.00$
<br />Wooden Panels - Interior Walls 34,970.00$
<br />WoodWorks Linear Veneered - Ceiling 19,045.00$
<br />149,545.00$
<br />7 THERMAL & MOISTURE PROTECTION
<br />Building Insulation 13,480.00$
<br />Waterproofing 10,755.00$
<br />Flat Roofing 74,195.00$
<br />Downspouts 1,615.00$
<br />100,045.00$
<br />8 DOORS & WINDOWS
<br />Doors and Frames 66,555.00$
<br />Windows and Glass Doors 76,125.00$
<br />Transaction Windows & Door (Bulletproof) - Ballistic Fiberglass Included 58,225.00$
<br />Storefront - Interior Glass Partitions 142,640.00$
<br />343,545.00$
<br />9 FINISHES
<br />Drywall and Framing / ACT included 184,327.50$
<br />Flooring - Honed Concrete 14,515.00$
<br />Flooring - Carpet 22,700.00$
<br />Flooring - ESD 1,645.00$
<br />Flooring - LVT 3,550.00$
<br />Walls - Tile 44,375.00$
<br />Exterior - Stucco 32,675.00$
<br />Baseboard (Rubber) 2,995.00$
<br />Interior Painting (Walls + Exposure Ceilings + GYP Ceilings) 24,655.00$
<br />Exterior Painting (Walls + Pressure Clean) 7,525.00$
<br />338,962.50$
<br />BUILDING DEPARTMENT RELOCATION TO ANNEX
<br />CITY OF SUNNY ISLES BEACH
<br />INVITATION TO BID 25-01-01
<br />PROJECT NO. 21-1011
<br />BIDDERS MUST USE THS EXCEL SPREADSHEET TO SUBMIT PRICE SHEET. FAILURE TO SUBMIT THIS PRICE SHEET
<br />MAY RESULT IN NON-RESPONSIVE BID SUBMISSION. DID NOT EDIT ORIGINAL CONTENT.
<br />ADDENDUM # 2 RELEASED ON 2/19/2025
|