My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LUNACON CONSTRUCTION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
LUNACON CONSTRUCTION
>
LUNACON CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:14:15 PM
Creation date
3/10/2025 1:09:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J�., <br />LUNACO <br />CONSTRUCTION GROUP r <br />March 04, 2025 <br />This statement confirms that to the best of its knowledge, Lunacon Construction Group, Corp. located in <br />Miami FL has had the following litigations filed by or against it or A/E/C-related litigation, action or claim <br />of projects of same or similar size, including but not limited to any action against or by any owner, <br />engineer, architect, contractor, subcontractor, material, men, or supplier, whether active, pending, or <br />concluded, at the mediation, arbitration, trial, or appellate level. There are no Lunacon Branch offices <br />under litigation. Closed cases have been provided which show litigation in favor of Lunacon. <br />CASE NUMBER: CACE24006025 <br />DATE FILED: 05/01/2024 <br />PLAINTIFF: The School Board of Broward County <br />DEFENDANT: LUNACON ENGINEERING GROUP, CORP <br />CASE TYPE: Breach of Contract <br />PROJECT: Central Park Elementary School <br />BASIS FOR CLAIM: Lunacon entered into a series of contracts with the School Board of Broward County. <br />On this project, as on the others listed, Lunacon is seeking additional costs as a result of the project being <br />extended for reasons beyond Lunacon's control. Lunacon has submitted TIAs (Time Impact Analysis) to <br />support its position and delays have often occurred as a result of the School Board's and its consultants' <br />delays in reviewing TIAs and other Lunacon documentation. Lunacon is also seeking contract sums to the <br />extent they are unpaid. Remarkably and regrettably, the delay amounted to 964 days, which Lunacon <br />cannot ignore. <br />PENDING <br />CASE NUMBER: CACE24006021 <br />DATE FILED: 05/01/2024 <br />PLAINTIFF: The School Board of Broward County <br />DEFENDANT: LUNACON ENGINEERING GROUP, CORP <br />CASE TYPE: Breach of Contract <br />PROJECT: Driftwood Middle School <br />BASIS FOR CLAIM: Lunacon entered into a series of contracts with the School Board of Broward County. <br />On this project, as on the others listed, Lunacon is seeking additional costs as a result of the project being <br />extended for reasons beyond Lunacon's control. Lunacon has submitted TIAs [Time Impact Analysis] to <br />support its position and delays have often occurred as a result of the School Board's and its consultants' <br />delays in reviewing TIAs and other Lunacon documentation. Lunacon is also seeking contract sums to the <br />extent they are unpaid. Remarkably and regrettably, the delay amounted to 1011 days, which Lunacon <br />cannot ignore. <br />PENDING rt <br />16890 South Dixie Highway, Palmetto Bay, FL 33157 - (o) 786.293.0035 - M 786.293.0333 <br />
The URL can be used to link to this page
Your browser does not support the video tag.