My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MBR Construction, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
MBR CONSTRUCTION
>
MBR Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:15:32 PM
Creation date
3/10/2025 1:15:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SIMILAR PAST PROJECT EXPERIENCE <br /> <br />1. DESIGN BUILD SERVICES FOR JOHNNY L TIGNER COMMUNITY CENTER – (2024) <br /> <br /> <br /> <br /> <br />The project involved the demolition of the existing one-story Johnny L. Tigner Community Center, <br />which was replaced by a new two-story concrete Tilt-wall building. The new structure had a total <br />area of 20,275 square feet and a total height of 32’-2”. The first floor covered 10,452 square feet, <br />while the second floor spanned 9,823 square feet. The building was located near the existing Leo <br />Robb Gymnasium, and as part of the design, a canopy or covered structure was included to provide <br />sheltered access between the two facilities. <br />In addition to the new building, the scope of work included several upgrades to the existing <br />gymnasium. These upgrades involved the installation of a new fire alarm system, modifications to <br />the sprinkler system, and the addition of a new Bi-Directional Amplifier (BDA) system to enhance <br />communication capabilities. Site improvements were also a major component of the project, with <br />enhancements made to the surrounding sidewalk area. A new drop-off/pick-up zone was created <br />for easier access, and the parking lot underwent major improvements to better accommodate <br />visitors and ensure safety and convenience. <br />The project successfully provided modernized facilities for the community, improving connectivity <br />between the new and existing buildings, enhancing safety systems, and creating a more functional <br />site layout. <br />Original Contract Amount: $ 10,916,547.02 Final Contract Amount: $ 11,723,200.53 <br />Client: City of Deerfield Beach Contact: Zannetha Newel, Project Manager <br />Telephone: 561 895 0087 Email: znewell@deerfield-beach.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.