My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MBR Construction, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
MBR CONSTRUCTION
>
MBR Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:15:32 PM
Creation date
3/10/2025 1:15:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SIMILAR PAST PROJECT EXPERIENCE <br /> <br />3. SUNRISE CITY PARK – (2020) <br />Scope of Work: The new and improved City Park, re-opened in November 2020, brings <br />impressive and contemporary park amenities to Sunrise’s original neighborhoods in the <br />east. This 5.5 acre leisure space was funded by park bonds overwhelmingly approved <br />by Sunrise voters as part of our long-term vision to foster a connected and engaged <br />community. The park construction included the renovation and expansion of the <br />existing parking lot, an expansive 140-yard multipurpose field for community events, <br />concerts, and a variety of sports, a new quarter-mile walking path featuring seven <br />outdoor exercise stations, a custom metal structure to serve as a covered amphitheater <br />stage, two covered event rental pavilions with gas grills, a soccer-themed 2,500 SF splash <br />pad and sun-shaded playground, three full covered outdoor basketball courts with <br />professional rims and backboards, two newly-resurfaced regulation tennis courts, <br />. <br /> <br />Original Contract Amount: Final Contract Amount: <br />Client: Contact: <br />Telephone: Email: mkaufold@sunrisefl.gov <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.