My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MBR Construction, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
MBR CONSTRUCTION
>
MBR Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:15:32 PM
Creation date
3/10/2025 1:15:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SIMILAR PAST PROJECT EXPERIENCE <br /> <br />5. DESIGN BUILD SERVICES FOR CAPORELLA PARK – (2023) <br />The scope of work included increasing the parking lot capacity by adding four more parking <br />spaces and an additional handicapped space. A new entry plaza to welcome visitors, and a 1,200 <br />square feet Restroom & Concessions Building. <br />In addition to these improvements, a 1/3 of a mile long concrete 8’ wide multipurpose trail was <br />developed, leading to all the park amenities. These amenities comprise a dedicated area with <br />10 fitness stations, complete with shade for users. A 5,000 square feet playground featuring <br />universal-access equipment and a shade structure which provides a safe and enjoyable space <br />for children. <br />A 40x40 Picnic Shelter was constructed, equipped with picnic tables and BBQ grilles for park <br />visitors to enjoy outdoor meals. The project also included the installation of a stage and <br />amphitheater, featuring a 2,500 square feet tensile structure stage along the edge of the lake. <br />A grass amphitheater/plaza area for spectators overlooking the expansive lake, serving as a <br />picturesque backdrop for events. <br />Furthermore, enhancements to recreational features included a fishing pier, accessible from the <br />new multipurpose walking trail. The pier has added lighting for better visibility. Additionally, a <br />new non-motorized boat launch with a floating deck was established, providing ADA direct <br />access from the primary parking lot. <br /> <br />Original Contract Amount: Final Contract Amount: <br />Client: Contact: <br />Telephone: Email: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.