My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERSONS SERVICES CORP
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
PERSONS SERVICES
>
PERSONS SERVICES CORP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:17:36 PM
Creation date
3/10/2025 1:16:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITB # 25-01-01 <br />City Annex Building Construction Renovations <br />Page 66 of 103 <br />Persons Services Corp. <br />Project 3: Davie Boys and Girls Club Addition <br />Persons Services Corp. provided an interior renovation and building addition to the <br />Boys and Girls club facility to convert an existing covered patio and amenities into a <br />new Multipurpose Teen Center. <br />The scope of work included the demolition of the existing courtyard that separated <br />the buildings and the interior walls in both the Teen Center and Children’s Center, <br />as well as the demolition of floors in various interior areas. This was followed by the <br />addition of footers, slabs, block walls, joists, and metal decking, along with the <br />installation of skylights and framing/drywall. New walls were constructed in the <br />interior areas, and the work included painting, flooring and, the addition of a new <br />fire sprinkler and fire alarm system. A new air conditioning system was also added. <br />Project Name: Boys & Girls Club <br />Addition CDBG <br />Location: 6901 Orange Drive Davie, FL <br />33314 <br />Owner: Town of Davie <br />Owner Contact: Cristina Garcia- <br />Marquez 954-797-1240 <br />Cgarcia-marquz@davie-fl.gov <br />Architect: Volkert <br />Architect Contact: Harold Eubanks <br />Start Date: 11/01/2023 <br />Completion Date: 10/12/2024 <br />Start Budget: $1,689,442 <br />Completion Budget: $1,689,442 <br />Change Order Amount: $700,000 Claims Against Owner: None
The URL can be used to link to this page
Your browser does not support the video tag.