Laserfiche WebLink
Waypoint Contracting, Inc., was selected by the City of Doral for the <br />construction of 2.7 acres of land. The ground up park consisted of a <br />shaded playground, a water front flexible event plaza, artificial turf <br />putting green space, outdoor fitness stations, two off-leash artificial <br />turf dog areas with washing stations, putting, multi-purpose <br />greenspace, concrete paver walkways and concrete sidewalks, <br />aluminum fence around the park, and a chain link fence around the <br />playground and dog areas. The park also consisted of a restroom <br />building, 11 parking spaces, and a connectivity to Downtown Doral <br />through the Downtown Doral Boardwalk located at the north side of <br />the park. <br />Client Contact: <br />Julio Amoedo <br />8401 NW 53 Terrace <br />Doral, FL 33166 <br />(305) 593-6740 ext. 6018 <br />julio.amoedo@cityofdoral.com <br />Architect: <br />Chen Moore and Associates <br />786-497-1500 <br />WHITE COURSE PARK <br />Doral, FL <br />Total Contract Value: <br />$3,200,000.00 <br />Start / End Dates: <br />03/2021 - 03/2022