Laserfiche WebLink
PROJECT: “Flagler Village Hotel”, project located in Fort Lauderdale hotel, parking and residential building, main scope of work build all the plumbing <br />system including equipment, grease waste system and oil system, management of suppliers, purchase, negotiation with sub-contractors, submitting RFI, <br />management of all the preconstruction stage submitting drawings and submittal for approval prior to start the project, estimating and budget and making all <br />decisions bringing benefits the company. <br />PROJECT: “Pearl Riverland”, project located in Fort Lauderdale, 6 residential buildings, parking, maintenance room and club house, main scope of work <br />build all the plumbing system including equipment, grease waste system and oil system, management of suppliers, purchase,negotiation with sub- <br />contractors, submitting RFI, management of all the preconstruction stage submitting drawings and submittal for approval prior to start the project, <br />estimating and budget and making all decisions bringing benefits the company. <br />PROJECT: “La Clara”, 25 history building with basement, preconstruction stage, BIM model coordination, negotiation with vendors, getting materials, <br />budget, submitting RFI and potential change orders, Field coordination with Suntech staff vendors , subcontractors and equipment coordination. <br />Furel Engineer. <br />Assistant Project Manager/ Superintendent <br /> 2013-2018 <br />PROJECT: “Relocation of county of Achí-bolivar 748 townhomes, public contract with the Colombian Government #0153 of 2017”. Public project with the <br />Colombian government, 14,76 Acres, field supervision and administrative tasks as financial reports, daily field reports, request inspections, assist to <br />meeting with owner, owner representative, inspector and public Colombian staff department of construction, MEP Field coordination, structure coordination <br />and MCU, since foundations until final stage of the construction like finish walls, drywall and start up equipment. <br />PROJECT: “construction of bank Coomeva”, with mezzanine, area built or remodeled: 1.242 Sq2 Administrative and technical support as a project <br />manager , Coordination and verification of activities in the field, for the construction of the administrative headquarters, Healthcare building and bank of the <br />Coomeva Companies groups. Constant follow- up to the technical, administrative and financial part of the project. Project composed of civil works, MEP, <br />Preparation of weekly reports among, budgeting, RFI’s, change orders, inventories and executing project as per book specifications and client <br />requirements. <br />PROJECT: “Intervention for the construction of administrative offices of Tigo-Une Communications and business center”. Working as a inspector, <br />coordination and verification of activities in the field, for the construction of the administrative office to the company Tigo-Une communications. Constant <br />follow-up to the technical, administrative and financial part of the project. Approve of works as per code and construction blue prints or set package, Project <br />consisting of civil works , MEP and communications. <br />PROJECT: “Civil works and central hydroelectric Celsia area built or remodeled: 543.4 Sq2”, Field Superintendent Coordination of construction, <br />subcontractors, 2 history building destinated as drivers rest area and visitors to the hydroelectric plant, from foundations to the finishes stage of the building <br />and Close out documents to customer satisfaction. Structural reinforcement and adequacy of bridges 1D and 2D, as well as construction evacuation route <br />in exhaust tunnel. Monitoring, control and direction to the field work, management of contractor and suppliers, weekly reports type "Technical" and <br />"Financial" of the project, as built drawings of the project. <br />PROJECT: “Solar Energy plant generation located in 3 island Cartagena Colombia”, Field Superintendent Coordination of construction, subcontractors, <br />construction equipment rooms destinated as a battery storage, pre- construction stage, collaboration with bidding, budget and them all the respective <br />coordination before start activities in the field. Field supervision from foundation to final stage of the project, daily and weekly reports, meetings with owner <br />and inspectors, Sub-meetings, managing vendors, suppliers and getting materials as per contract documents, book specifications and construction set <br />package drawings. <br />PROJECT: “Solar plant Nazareth Guajira Colombia, Built area: 6732 Sq2”. Construction of Solar plant in Colombia, contract with the Colombian <br />government or public contract, The 2nd largest solar plant built in Colombia, installation of solar panels and construction equipment rooms. Foundations, <br />land movement, and concrete or metal structures for Panel support, followed by the building control and estimating (excavations, step boxes, soil <br />compaction, pipe installation, among others). Management of staff (including assistant superintendent) and subcontractor at all costs, purchases, weekly <br />and daily reports, financial reports and control project.