My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFP NE 174th Street Roadway Improvements (final)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-11-01 NE 174th St. Roadway Improvements
>
RFP NE 174th Street Roadway Improvements (final)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2014 4:22:14 PM
Creation date
11/4/2014 4:20:55 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
NE 174th Street Roadway Improvements
Bid No. (xx-xx-xx)
14-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Request for Proposal No. 14-11-01 33 <br /> <br />CITY OF SUNNY ISLES BEACH <br />NE 174TH STREET ROADWAY IMPROVEMENTS <br />CSIB RFP NO. 14-11-01 <br />CAS PROJECT NO. 14-1758 <br /> <br />BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE <br />A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM <br />AND/OR UNIT PRICES. <br /> <br />ITEM <br />NO DESCRIPTION QUANTITY UNIT <br />UNIT <br />COST TOTAL <br />SUBTOTAL STORMWATER PIPES ITEMS 62 - 67 $_____________ <br /> <br /> <br />UTILITIES 68 – 73 <br /> <br />The price for each construction item shall include but not be limited to all labor, equipment and materials necessary to <br />install and construct these items in accordance with these contract documents which include all saw cutting, asphalt <br />removal and disposal, excavation, de-watering where possible, de-watering & NPDES permits, including the required <br />construction of best management practices to maintain turbidity within the required NPDES standards during the <br />duration of the project, bedding material, backfill base material, sodding, curbing, sidewalk, backfill limerock base <br />material, compaction, material to be restored to same elevation as existing asphalt pavement (grade to slope) grading, <br />testing, inspections and any other miscellaneous work. <br />68 <br />6" DIP WM Deflection (incl. Bends, <br />fittings, pipe) 1 EA <br />69 <br />Modification of Existing Sanitary Manhole <br />Per MDC-WASD Standards 1 EA <br />70 <br />Adjustment of Covers for Existing Utilities <br />(where necessary) 1 LS <br />71 <br />Deflection of Existing BCTV & <br />Coordinate w/Utility 4 EA
The URL can be used to link to this page
Your browser does not support the video tag.