Laserfiche WebLink
specified act, failure, refusal, omission, event, occurrence or condition shall be deemed not to <br />constitute a material breach of this Contract. <br />1.5.6. Words or terms used as nouns in this Contract shall be inclusive of their singular <br />and plural forms, unless the context of their usage clearly requires a contrary meaning. <br />1.5.7. The Contractor shall have a continuing duty to read, carefully study and compare <br />each of the Contract Documents, the Shop Drawings and the Product Data and shall give written <br />notice to the City of any inconsistency, ambiguity, error, or omission which the Contractor may <br />discover with respect to these documents before proceeding with the affected Work. The issuance, <br />or the express or implied approval by the City or the Engineer/ Architect of the Contract <br />Documents, Shop Drawings or Product Data shall not relieve the Contractor of the continuing duties <br />imposed hereby, nor shall any such approval be evidence of the Contractor's compliance with this <br />Contract. The City has requested the Engineer / Architect to only prepare documents for the <br />Project, including the Drawings and Specifications for the Project, which are accurate, adequate, <br />consistent, coordinated, and sufficient for construction. HOWEVER, THE CITY MAKES NO <br />REPRESENTATION OR WARRANTY OF ANY NATURE WHATSOEVER TO THE CONTRACTOR <br />CONCERNING SUCH DOCUMENTS. By the execution hereof, the Contractor acknowledges and <br />represents that it has received, reviewed and carefully examined such documents, has found them <br />to be complete, accurate, adequate, consistent, coordinated and sufficient for construction, and <br />that the Contractor has not, does not, and will not rely upon any representation or warranties by <br />the City concerning such documents as no such representation or warranties have been or are <br />hereby made. The Contractor further acknowledges and represents that it has made a thorough <br />and careful examination and inspection of existing conditions on the Project site, both surface and <br />subsurface, and the Contractor expressly acknowledges and agrees that it shall make no claim for <br />additional compensation due to existing site conditions including, but not limited to, rock, surface <br />and subsurface water, existing structures, and deficient soil, provided said conditions could be <br />determined or ascertained from a thorough and careful examination and inspection of the site. <br />1.5.8. Neither the organization of any of the Contract Documents into divisions, sections, <br />paragraphs, articles, (or other categories), nor the organization or arrangement of the Design, shall <br />control the Contractor in dividing the Work or in establishing the extent or scope of the Work to be <br />performed by Subcontractors. <br />1.5.9. Whenever the word "days" is used, it shall mean calendar days and not <br />working/business days unless otherwise specified. <br />1.5.10. Contractor shall comply with Section 255.04, Florida Statutes, in selecting <br />subcontractors, materials and suppliers. <br />1.6 Ownership of Contract Documents <br />1.6.1. The Contract Documents, and each of them, shall remain the property of the City <br />unless the City has agreed otherwise with the Engineer / Architect. The Contractor shall have the <br />right to keep one record set of the Contract Documents upon completion of the Project, provided <br />however, that in no event shall Contractor use, or permit to be used, any or all of such Contract <br />Documents on other projects without the City's prior written authorization. <br />Page 3 of 42 <br />353 <br />