Laserfiche WebLink
FM# <br />Page 7 of 13 <br />mowing or removing litter during construction of the Project. After completion of construction, <br />the City shall assume all maintenance responsibilities for the Local Roadway Improvements. <br />Upon completion of construction, the Department is required to invite the City on the Final <br />Inspection of the work within the Off -System Project Limits, and will incorporate legitimate City <br />concerns that are within the scope of the contract into the final Project punch list to be corrected <br />by the Contractor. Notice for Final Inspection shall be delivered via email to the City and the <br />notice provision of paragraph 20 shall not be applicable. However, if the City does not attend the <br />Final Inspection, the Department shall proceed to conduct the Final Inspection, finalize the <br />Project punch list, and issue a Notice of Final Acceptance to its Contractor. The Final Inspection <br />shall be performed and the Notice of Final Acceptance shall be issued in accordance with the <br />Department's Standard Specifications for Road and Bridge Construction and the Construction <br />Project Administration Manual (CPAM). <br />Upon issuance of the Notice of Final Acceptance to the Contractor, the Department shall provide <br />a copy of said notice to the City. As of the date of the Notice of Final Acceptance, the City shall <br />be immediately responsible for the maintenance of the Local Roadway Improvements, and shall <br />further accept the Local Roadway Improvements. The Department, however, shall have the right <br />to assure completion of any punch list by the Contractor. Notwithstanding the issuance of the <br />Notice of Final Acceptance, the City may notify the Department Project Manager of deficiencies <br />in the Local Roadway Improvements that may be covered by the warranty provisions in the <br />contract between the Department and its Contractor. The Department shall enforce the warranty <br />if remedial action is required by the warranty provisions, as determined by the Department. <br />Upon completion of all work related to construction of the Project, the Department will be <br />required to submit to the City final as -built plans for the Local Roadway Improvements and an <br />engineering certification that construction was completed in accordance with the plans. <br />Additionally, the Department shall vacate those portions of the City's right-of-way used to <br />construct the Local Roadway Improvements, and shall remove the Department's property, <br />machinery, and equipment from said portions of the City's right-of-way. Furthermore, the <br />Department shall restore those portions of the City right-of-way disturbed by Project construction <br />activities to the same or better condition than that which existed immediately prior to <br />commencement of the construction of the Project. <br />Rev. 10/24 7 <br />340 <br />Docusign Envelope ID: 2F7CF222-63FB-4C7F-AE4C-0B8E05F97D6F