Laserfiche WebLink
QTY <br />PART# <br />DESCRIPTION <br />SIN <br />CONTRACT <br />UNIT <br />NET UNIT <br />EXTENDED <br />PRICE <br />PRICE <br />PRICE <br />1.00 <br />Open Market <br />Unmanaged Hardened Gigabit Ethernet Poe <br />$475.32 <br />$475.32 <br />$475.32 <br />SISTP1040- <br />+ Switch. (4) 10/100/1000Base-T Poe+ [100 <br />342 -LRT <br />M/328 Ft.] With (2) 100/1000Base-X SFP <br />Slots <br />3.00 <br />Open Market <br />CS34P ETL Verified Category 6 U/UTP <br />$465.21 <br />$465.21 <br />$1,395.63 <br />CMP- <br />Cable, plenum, blue jacket, 4 pair count, 1000 <br />00423CS34- <br />ft (305 m) length, CommPak <br />6U-06 <br />1.00 <br />Open Market <br />Outdoor 4*30W PoE, 2"SFP, 2'RJ45 Switch <br />$594.00 <br />$594.00 <br />$594.00 <br />H40 -044-30- <br />150-V3 <br />10.00 <br />Open Market <br />IP Camera Ethernet Over Coax Base Unit, <br />$491.93 <br />$491.93 <br />$4,919.30 <br />VLS-1 P -BC <br />Base Side, For Long Range Ethernet Over <br />Coax <br />10.00 <br />Open Market <br />IP Camera Ethernet Over Coax Base Unit, <br />$490.88 <br />$490.88 <br />$4,908.80 <br />VLS-1 P -CC <br />Camera Side, For Long Range Ethernet Over <br />Coax <br />67.00 <br />GSA-VSS-ROI- <br />Two Man Hourly Rate Incl project manager <br />334220 <br />GS -07F- <br />$148.10 <br />$148.10 <br />$9,922.70 <br />01 <br />0031W <br />1.00 <br />OLM <br />Project Installation Materials <br />$540.00 <br />$540.00 <br />$540.00 <br />8.00 <br />OLM <br />OLM - Order Level Materials <br />$175.00 <br />$175.00 <br />$1,400.00 <br />Vetted Installation Project Manager (Per <br />Hour) <br />29.00 <br />GSA-VSS-ROI- <br />Rate For Subcontracted Services <br />334220 <br />GS -07F- <br />$577.24 <br />$577.24 <br />$16,739.96 <br />05 <br />Vetted Electrical Installation. Passthrough for <br />0031W <br />Otis Elevators to support camera <br />installation. 100% due at time of order. <br />5.00 <br />GSA-VSS-ROI- <br />Rate For Subcontracted Services <br />334220 <br />GS -07F- <br />$506.38 <br />$506.38 <br />$2,531.90 <br />05 <br />Passthrough for Kone Elevators to support <br />0031W <br />camera installation. 100% due at time of <br />order. <br />57.00 <br />GSA-VSS-ROI- <br />Rate For Subcontracted Services <br />334220 <br />GS -07F- <br />$588.95 <br />$588.95 <br />$33,570.15 <br />05 <br />Vetted Electrical Installation. Conduit work <br />0031W <br />required for camera connection from elevator <br />mechanical rooms to IT closets. <br />1.00 <br />VSS- <br />Vetted Shipping <br />$600.00 <br />$600.00 <br />$600.00 <br />SHIPPING <br />Scope of Work <br />TOTAL: $98,899.56 <br />Project Total: $98,899.56 <br />-VSS to install cameras in the following park elevators: <br />(2) Gateway Pedestrian Bridge Elevators <br />(2) Gateway Main Park Elevators <br />Page 2 of 3 <br />