My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3836
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 10:03:36 AM
Creation date
6/12/2025 10:00:41 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3836
Date (mm/dd/yyyy)
05/15/2025
Description
Auth. CM to Negotiate & Execute Agmnt w/ Millenium Products, Inc. for Elevator Surveillance Cameras (CCTV).
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />(305) 947-0606 phone (305) 949-3113 Fax <br />WHEREAS, the City wishes to enter into this Agreement with Contractor to provide the <br />desired Services for an amount of Sixty -Eight Thousand Three Hundred Thirty -Three Dollars and <br />Eighty -Eight Cents ($68,333.88), plus Fifty -One Thousand One Hundred Dollars and Forty -Four <br />Cents ($51,100.44) as a contingency amount, if necessary, resulting in a total not -to -exceed <br />amount of One Hundred Fifty Thousand Dollars and No Cents ($150,000.00); <br />NOW THEREFORE, in consideration of the promises and the mutual covenants herein <br />name, the parties agree as follows: <br />TERMS <br />1. RECITALS. The Recitals set forth above are hereby incorporated into this Agreement <br />and made a part hereof for reference. <br />2. THE CONTRACT DOCUMENTS. The Contract Documents consist of this Agreement, <br />as well as the terms and conditions of the GSA Solicitation No. 47QSMD20R0001 and awarded <br />agreement with Contractor (Contract Number GS -0717-0031 W) and Contractor's GSA Authorized <br />Federal Supply Schedule Price List, which are specifically incorporated herein and made a part <br />hereof as Attachment `B," as well as Contractor's Proposal, attached and incorporated herein as <br />Attachment "A" (hereinafter referred to collectively as "Contract Documents"). In the event of any <br />conflict between or among the contract documents or any ambiguity or missing specifications or <br />instruction, the following priority is established: <br />A. First, this Agreement Between the City of Sunny Isles Beach and Millenium Products, <br />Inc.— Contract No. 2025-7081-2. <br />B. Second, the terms and conditions of GSA Solicitation No. 47QSMD20R0001 and <br />Contract Number GS -07F-0031 W), including the Solicitation Document, and GSA's <br />Authorized Federal Supply Schedule Price List. <br />C. Third, Contractor's Proposal, appended as Attachment "A." <br />3. SERVICES. Contractor shall provide equipment and services to the City pursuant to <br />the terms and conditions set forth in the Contract Documents, to specifically include, but not <br />limited to, installing closed-circuit television (CCTV) cameras in City's Gateway pedestrian <br />bridge elevators, Gateway Park elevators, Pelican Community Park elevator, Heritage Park <br />Elevators, and Government Center elevators, as more particularly described in Attachment <br />"A." Contractor shall submit its Proposed Schedule and identify its milestone completion <br />deadlines within 10 days from the date of the execution of this Agreement. <br />Final Clean-up: At all times, Contractor shall keep the premises free from accumulation of waste <br />materials or rubbish caused by its employees or the Work. Upon final completion of the Work and <br />before acceptance and final payment shall be made, Contractor shall clean and remove from the <br />property, all surplus and discarded materials, rubbish, and equipment. Contractor is responsible <br />for hauling all construction debris. Contractor shall restore in an acceptable manner all property <br />which has been damaged as a result of the Work. The Contractor shall leave entire area and vicinity <br />unobstructed and in a neat and presentable condition. <br />Damage to Property: If any property is damaged while Contractor is performing the Work, it shall <br />be repaired or replaced at the sole expense of Contractor in a manner acceptable to the City prior <br />MILLENIUM PRODUCTS, INC. 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.