Laserfiche WebLink
<br /> <br />17 <br />ITB 25-06-01 CITYWIDE HVAC MANAGEMENT PREVENTATIVE MAINTENANCE <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />2.13 COMPLIANCE WITH FEDERAL STANDARDS <br /> <br />All items to be purchased under this contract shall be in accordance with all governmental <br />standards, to include, but not be limited to, those issued by the Occupational Safety and <br />Health Administration (OSHA), the National Institute of Occupational Safety Hazards (NIOSH), <br />and the National Fire Protection Association (NFPA) and applicable provisions of the Americans <br />with Disabilities Act (ADA) in the course of providing any services. <br /> <br />2.14 LABOR, MATERIALS, AND EQUIPMENT SHALL BE SUPPLIED BY THE CONTRACTOR <br /> <br />The Contractor shall furnish the following, including but not limited to, all labor, material, <br />equipment, barricading, adequate supervision, and coordination for satisfactory contract <br />performance. When not specifically identified in the technical specifications, such materials and <br />equipment shall be of a suitable type and grade for the purpose and meeting or exceeding all <br />permit or industry standard requirements. All material, workmanship, 100% design, testing and <br />equipment shall be subject to the inspection and approval of the City Manager or his designated <br />representative for this project. <br /> <br />2.15 ACCIDENT PREVENTION AND BARRICADES <br />Barricades, cones, construction fencing, temporary construction fencing and off duty police <br />officers, per City regulations and other relevant requirements, shall be provided by the Contractor <br />when work is performed in areas traversed by persons, vehicular traffic or when deemed <br />necessary by the City Manager at no extra cost to the City. <br /> <br />The Contractor is to maintain appropriate and signage for the purpose of safeguarding the general <br />public while work is ongoing. All work shall be completed in a safe and workmanlike manner every <br />day and the Contractor shall secure the site prior to leaving at the end of each and every day. <br /> <br />2.16 CORRECTION OR REMOVAL OF DEFECTIVE WORK <br /> <br />If required by City, Contractor shall promptly, as directed and at its sole expense, either correct <br />all defective Work, whether or not fabricated, installed or completed, or, if the Work has been <br />rejected by City, remove it from the site and replace it with non-defective Work. Contractor shall <br />bear all direct, indirect and consequential costs of such correction or removal (including but not <br />limited to fees and charges of engineers, architects, attorneys and other professionals) made <br />necessary thereby. <br /> <br />2.17 DAMAGE TO PUBLIC OR PRIVATE PROPERTY <br /> <br />If property (public or private) is damaged while Contractor is performing work specified or is <br />removed for the convenience of the work, it shall be repaired or replaced at the expense of the <br />contractor in a manner acceptable to the City prior to the final acceptance of the work. Contractor <br />will be responsible for applying and securing any permits that may be required to complete such <br />repairs. Such property shall include but not be limited to: existing facilities and all of its