Laserfiche WebLink
CSI Number Mod UOM - Description LineTotal <br />4 -Additional Scope of Work <br />62 31 23 16 13-0013 0072 MOD For Up To 20, Add $46.84 <br />Qty Unit Price Factor Total <br />Installation 10 X $4.04 X 1.1594 $46.84 <br />63 32 11 23 16-0008 SF 8" Crushed Aggregate Base Course For Sidewalks <br />$16.31 <br />Qty Unit Price Factor <br />Total <br />Installation 5.56 X $2.53 X 1.1594 <br />$16.31 <br />Contractor Notes: For installation of Sidewalk 10 X 5 = 50 /9 = 5.56 SY <br />64 32 11 23 16-0008 0012 MOD For Up To 1,000, Add <br />$4.38 <br />Qty Unit Price Factor <br />Total <br />Installation 5.56 X $0.68 X 1.1594 <br />$4.38 <br />65 32 11 29 13-0003 SY 8" Thick FDOT Limerock $389.27 <br />Qty Unit Price Factor Total <br />Installation 4.45 X $75.45 X 1.1594 $389.27 <br />Contractor Notes: Asphalt Work = 1- X 4 = 40 /9 = 4.45 SY <br />66 32 11 29 13-0003 <br />0008 MOD For Up To 500, Add <br />$82.39 <br />Qty Unit Price Factor Total <br />Installation 4.45 X $15.97 X 1.1594 $82.39 <br />67 33 42 3100-0015 EA 6' Deep, T-8" x T-8" x 6" Thick Wall, Cast In Place, Grate Drop <br />$4,006.21 <br />Inlet Basin <br />Qty Unit Price Factor Total <br />Installation 1 X $3,058.40 X 1.1594 $3,545.91 <br />Demolition 1 X 397.02 X 1.1594 $460.30 <br />Contractor Notes: New Structure - Furnish, Install and Demo the existing <br />Subtotal for 4 -Additional Scope of Work: <br />$9,213.96 <br />Grand Total: <br />$57,990.54 <br />This work order proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal <br />total is due to rounding of the line totals and sub -totals. <br />The Percent of NPP on this Proposal: 0.00 <br />Contractor Price Proprosal Details - Category 8 of 8 <br />This report was not generated or reviewed by your Account Manager of The Gordian Group <br />