My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-10-01 NE 174th Tree Removal and Relocation
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2014 9:56:29 AM
Creation date
12/4/2014 9:49:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |Request for Proposal No. 14‐10‐01 16 <br /> <br />Section 3 <br />Scope of Services / Technical Specifications <br /> <br />3.1 SCOPE OF SERVICES <br /> <br />Proposed are relocations and removals of existing trees and palms within the roadway corridor of NE 174th <br />Street. Bids shall include all labor and material to perform said removals/relocations, including but not limited <br />to bed preparation and mulching at relocation sites, staking and guying, stump removals, root pruning and <br />trimming as well as any other incidentals reasonably required to perform the work outlined in this scope of <br />services. The successful proposer shall be required to maintain the relocated trees for a period of one (1) <br />year after relocation. <br /> <br />The City may endeavor to root prune the trees designated for relocation prior to the successful proposer’s <br />start of work. In this event, the construction duration for removal and relocation of the existing plant material <br />shall be thirty (30) days from notice to proceed to substantial completion. Final completion shall be fourteen <br />(14) days thereafter. <br /> <br />In the event that the root pruning activities are to be included in this scope of services, a maximum of sixty <br />(60) days shall be allotted between root pruning and tree relocation. Construction duration shall be seventy <br />(70) days from notice to proceed for substantial completion. Final completion shall be considered as fourteen <br />(14) days thereafter. <br /> <br />The Miami-Dade County tree removal permit application has been submitted to the Tree Permitting Program <br />by the City. Regardless of root pruning, the successful contractor shall be responsible to securing any <br />additional permits through the City or County for the scope of work described herein. If any portion of the <br />contract documents or plans is not clear or contradictive, the proposer is to submit a question/clarification in <br />writing prior to submitting a bid proposal. <br /> <br /> <br /> <br />END OF SECTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.